Laserfiche WebLink
.. 'IV,f .x7 <br /> , COMPLIANCEK z, <br /> REQUIRED r ,ggpr �y , , yy1� 1 ANIMEll <br /> .tlM 3 <br /> na5,. <br /> INSPEC <br /> APPROVED IMPORTANT:Supply Information In the shaded area by chocking filo appropriate circles. <br /> Disregard topics that don't describe your building or equipment.DOSIDI place checks In <br /> the two left columns. <br /> ❑ Q Slab Insulation (Table 6.1)shall be R-10 and located on the: <br /> Q A. Exterior(See INSULATION INSPECTION), <br /> OR <br /> Q B: intedor.oxtending downward from the top slab surface to Its undersurface and <br /> horL-.ontailyunder the slab for a total distance of 244, or vertically 24". <br /> ❑ ❑ ORadlant Slab Insulation shall have R-10 and extend under the entire slab(S. 502.1.4.9) <br /> ❑ s Baiow grado masonry wall Insulation(S.502.1.4.10) shall be full-depth and located on the: <br /> Q A. Exterior and rated R-10(See INSULATION PHASE): <br /> OR <br /> O B. Interior(See INSULATION PHASE)ad <br /> ❑ Q Thermal break(s)shall be placed In the slab(S.502.1.4.5, 201.1:BUILDING ENVELOPE) <br /> between the conditioned and unconditioned spaces chocked below, and extend from the top of the <br /> slab to the bottom, than underneath toward the londitloned space for a 24"total developed dimension. <br /> Vdwelling/garage (]dwelling/connecle spaco lab edge and fow,dation will. <br /> ❑ ❑ QRadon mitigation system (VIAO, S. 502.1) shall :,; installed if one of the following is checked: <br /> O A. Net foundation ventilation area is lesp inan 1 FT2 per 300 F12 of crawl space <br /> Q B. Foundatinn vents are closable. <br /> Q C. Under floor plenum acts as supply or return air duct <br /> LFoundallon pt ase requlrements:d by: _Date <br /> FRAAIJNG PHASE <br /> ❑ Q All structuu panels such as plywood, particle board, wafer board, and oriented strand board shall be <br /> labled"FXPOSURE I""EXTERIOR"or"HUD-APPROVED"(VIAO, S.401.1). <br /> ❑ Q Insulation baffles shall be placed in attics/ceilings to maintain at least 1"ventilation spare and extend at <br /> least 6"vertically above balls or 12"vertically above loosefill Insulation(S. 502.1.4.5). <br /> ❑ OGlazing efficloncy required under the selected option shall be (S. 502.1.5, 602.7.2,Table 6-1)! <br /> 0.- IJAG (Option 1) Q U.43 (Option; II) &',: U.40 (Option III, IV) <br /> 0j U.39 (Option V) O s U.36(Oplion VI) O s U.35 (Option V1Q O ; U.32(Option VIII) <br /> Symbols used; =oquals >groater than r loss than p greater than or equal s less tlrnn or equal `. <br /> UPDATED SCPTEM'i[e 1091 <br /> Page 2 of 6 <br />