Laserfiche WebLink
• • ] A 0 <br /> COMPLIANCE <br /> nEOUIRED Ee 1 <br /> INSPECnoN IMpORTANT: please supply Information In no shaded boxes and check the approprlato <br /> APPROVED circles. Disregard topics that don't describe your building or equipment.I2O31.OI place <br /> checks In the two left columns. <br /> p 0 Glazinglskylights by typo ---� See the Washington glazing dlredory <br /> Manufacturer Frame material #Layers Model # Area(Ft2) U o3 � e <br /> ue Tested? <br /> No. <br /> ✓a✓YL Sud <br /> 2 f C 25- U. 36 es <br /> 2 <br /> so U. es Q <br /> � sit <br /> S[rreL /z U- es V <br /> / U 3S es Q <br /> Sc. 6[ 4).-> bG•G U. es <br /> 2 _,n•'� 2 0 U.-3—d2 es <br /> I U.— es <br /> U._ Yes <br /> U.— es <br /> I0 (] 10 Single Glazing (No more dv l%of Aoalad hoer Nen boloie d:AlUq,S.602.71) U.— CS <br /> Typo: No: Area: <br /> U.— Yes <br /> Type: No: Area <br /> 0 O rr Untested Glazing (uwonly dol�nuvR L1cnapler10.S- ooa.l) <br /> Type: <br /> No: A; <br /> Type: <br /> No: Area: 202.10 U•— <br /> TOTAL GLAZING AREA(Add entire column) --► -70e" <br /> um Al.iG <br /> JEDIr2 Maximum Allowed glazing area(S.602.7.1) is derived by taking the the total olazing area <br /> of -.•{jt!2f—._.. F12 and dividing by the total conditioned floor area of Multiply this number by 100. This value cant exceed the glacong percentage for yocurol(para ptiolt) <br /> O _< 10%(Option 1) O s 12%(Opllons 11, 111) (Jr s 15/°(Option 1V)Q16%(OptionV) 21%(OptiohVI) 25°10(Option VlqGlazing <br /> ra dazing documentatlegjnsuticient, U•values shall be justified by Mir. testing report.' (N,O ro Glazing air leakage(S. 502.4.3 (c)) measures shall be met as follows <br /> 1) fixed site built:slops with sealant. <br /> 2) operating site built:wealherstripped with closer rs Concealed Insulation shall be placed: 1) Behind shower/tub 2) Behind partition sludslcorner <br /> rs Standard air leakage caulking is complete and installed in the following locations (S. 502.4.3): <br /> 1) between Sole plate/subfloors 4) partition stud penetrations <br /> 2) wiring/plumbing/duct register penetrations 5) 3lgound fixture/flue <br /> and penetrations <br /> r ' <br /> 3) rim joists/mud sills(heated lower floors) 6) page 3 of 6 <br />