Laserfiche WebLink
COMPLIANCE ` 1COMPLIANCE <br /> REQUIRED <br /> INSPEC <br /> APPRO ED IMPORTANT:Supply Information In the shaded area by chocking the appropriate circles. <br /> APPROVED Dlsregald topics that don't describe your building or equipment.DOMT place checks In <br /> the two left columns. <br /> FOUNDATIONPHASE <br /> ❑ ❑ Q Slab Insulation(Table 6.1)shall be R•10 and located on the; <br /> Q A. Exterior(See INSULATION INSPECTION). <br /> OR <br /> Q B. Interior extending dowmvatd from the top slab surface to Its undersurface and <br /> horizontally under the slab for a total distance of^4",or vertically 24". <br /> ❑ ❑ Radlant Slab Insulation shall have R-10 and extend under the entire slab(S. 502.1.4.9) <br /> El [I8 Below grade masonry wall Insulation(S.502.1.4.10)shall be full-depth and located on the: <br /> Q A. Exterior and rated R•10(See INSULATION PHASE). <br /> OR <br /> Q B, Interior(Soo INSULATION PHASE) <br /> ❑ ❑ D Thermal break(s) shall be placed in the slab(S.602.1.4.5,201.1:BUILDING ENVELOPE) <br /> between the conditioned and unconditioned spaces checked below, and extend from the top of the <br /> slab to the bottom, then underneath toward the conditioned space for a 24"total developed dlmonslon. <br /> O dwelling/garage O dweliinglconnected space O slab edge and foundation wall. <br /> ❑ ❑ (DRadon mitigation system (VIAO, S 502.1) shall be Installed If one of the following Is checked: <br /> X,A. Net foundation ventilation area is less than 1 FT2 per 300 F12 of crawl space <br /> O B. Foundation vents are closable. <br /> 0 C. Under floor plenum acts as supply or return air duct <br /> InsWSEC Foundation phase requirements: — <br /> pected by: _Date___ <br /> FRAMING PHASE <br /> ❑ © Q All structural panels such as plywood, particle board, wafer board, and oriented strand board shall be <br /> tabled" EXPOSURU I""FXI ERIOR"or"HUD-.APPROVED"(VIAO, S.401.1). <br /> ❑ E3 O Insulation baffles shall be placed in attics/ceilings to maintain at least 1"ventilation space and extend at <br /> least 6"vertically above baits or 12"vertically above loosefill Insulation (S. 502.1.4.5). <br /> ❑ ❑ Glazing efficiency required under the selected option shall be(S. 502.1.5, 602.7.2, Table 5.1): <br /> 0.- U.46 (Option 1) O s U.43 (Opti(,ns 11) {� s U.40 (Option III, 1V) <br /> 0s U.39 (Option V) 0 s U.36(Oplion VI) Q s U.35 (Option VII) O s U.32(Option VIII) <br /> Symbols used: =oquala >proater than <loss than > proator than or oqual s loss than or equal <br /> UPDAIED SEPTEMeEn 1991 <br /> Page 2 of 13 <br />