Laserfiche WebLink
NCETHECKLIST <br /> COMPL ONCE 1991 WSEAMDENTIAL ' ' <br /> f REQUIRED <br /> INSPEcnoN IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br /> APPROVED circles. Disregard topics that don't describe your building or.quipment. (24101 place <br /> checks In the two left columns. <br /> p D °� Glazing/skylights by type Sec the Washington glazing directory J <br /> No. Manufacturer Frame matorial # Layers Model # Area (Ft2) Uo value Tested? <br /> U._ Yes U <br /> 5 ?_0 5 U. es <br /> /.t• .r <br /> !7 <br /> U. es <br /> U._ Yes <br /> U._ 1yes Q <br /> U.— Yes <br /> U._ Yes O <br /> U._ Yes <br /> U._ Yes <br /> U._ Yes 0. <br /> C3 0 10 single Glai2zing (Namorethan 1%olheatednoor area before doubling,S.602.72) U.— Yes <br /> Type: No: Area: X2 U.— Yes <br /> Type: No: Area X2 U.— Yes <br /> C:1 O 11 Untested Glazing (u"only default U values In Chapter 10.S.1006.1) <br /> Type: No: Area: U.— <br /> Type: No: Area: U.— <br /> TOTAL GLAZING AREA(Add entire column) S <br /> O O 1s Maximum Allowed glazing area(S.602.7.1) is derived by taking the the total glazing area Ft2 <br /> of_ Ft2 and dividing by the total conditioned floor area of ,. <br /> Multiply this number by 100. This value cant exceed the glazing percentago for your Selected option: <br /> O s 106/o(Option 1) C s 12%(Options II, III) C s 15%(Option IV) <30%(Option VIII) <br /> O s 18%(Option V) s 21%(Option VI) 0 s 25%(Option VII) Glazing % - 1 — <br /> ED O 1s Lazing documenlatlorLinsuticiem, U•values shall he justified by Mir.testing report. <br /> E3 fa Giazing air leakage(S. 502.4.3 (c); measures shall be met as follows : <br /> 1) fixed site built: stops with sealant. <br /> 2) operating site built:weatherstripped with closer <br /> 1-1 l� 15 Concealed Insulation shall be placed: 1) Behind shower/tub 2) Behind par Ilion studs/corner <br /> O O 1s Standard air leakage caulkinp is complete and installed in the following locations (S. 502.4.3): <br /> 1) between Sole plateisubfloors 4) partition stud penetrations <br /> 2) wiring/plumbing/duct register penetrations 5) light fixture/flue penetrations <br /> 011 <br /> 3) rim joists/mud sills (heated lower floors) 6) around window and door irar-Page 3 of 6 <br />