My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/05/12 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/05/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 11:51:22 AM
Creation date
4/17/2017 11:50:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 6 <br /> PROJECT TITLE: <br /> Amendment No.1 to the Consent COUNCIL BILL# <br /> Professional Services X Action Originating Department Planning Dept. <br /> Agreement between the City of First Reading Contact Person Allan Giffen <br /> Everett and Makers Second Reading Phone Number (425)257-8725 <br /> Architecture and Urban Design Third Reading FOR AGENDA OF May 12, 2010 <br /> regarding the Evergreen Way Public Hearing <br /> Corridor Plan <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Evergreen Way Corridor, PSA-11/12/09 Contract Legal,Planning <br /> 41 Street to 148th Street Contract EETP Grant-4/5/10 <br /> SW <br /> Amount Budgeted $270,835 <br /> Account Number(s): 0215010446410; <br /> Expenditure Required $228,565 215010448110, 0215010448210, 0215010448410 <br /> Budget Remaining $42,270 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The City is expanding the area and the scope of work of the Evergreen Way/SR99 Corridor Plan based upon <br /> the award of an Energy Efficiency through Transportation Planning Grant awarded to the City(and the City <br /> of Mukilteo and Snohomish County)by the Department of Commerce. The study area will be expanded <br /> from Gibson Rd.to 148th St SW, a distance of 1.5 miles,the analysis of the station nodes will be expanded <br /> from a'/4 mile to a%2 mile radius, and an effort will be made to improve all modes of transportation in the <br /> corridor. <br /> Staff proposes to amend the contract with Makers,Inc., a planning and architectural consultant, and their <br /> assembled sub-consultant team,Perteet,Inc.,Property Counselors, and T-Usability, for continued assistance <br /> with the corridor revitalization plan. <br /> RECOMMENDATION: <br /> Authorize the Mayor to execute Amendment No. 1 to the Professional Services Agreement between the City <br /> of Everett and Makers Architecture and Urban Design regarding the Evergreen Way Corridor Revitalization <br /> Plan. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.