Laserfiche WebLink
6. Provide insulation baffle at each vented rafter space. Baffles shall extend 6" <br /> vertically above halts and 12" vertically above loose fill insulation, per sec. <br /> 502.1.4.5 W.S.E.C. Show on plans. <br /> 7. Provide 6 mil black vapor barrier in crawl space. Lap edges 12". <br /> 8. Provide min. 50 cfm fan, vented to the exterior in new bathroom. <br /> 9. Provide detail on intermediate supports in crawl space. <br /> Prepare a response letter showing where each item in this correction letter is addressed <br /> on the plan set. <br /> Upon resubmittal of the drawings, your application will be given prioriiy and plan <br /> review will recommence. <br /> All requited submittals shall be of sufficient detail and contain sufficient information to <br /> ensur-- that the proposed stnicture will be constricted in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> JI1 jd;50883 <br />