Laserfiche WebLink
I.tr. Ms. Blackburn <br /> October 7, 2005 <br /> Page 2 <br /> Please prepare a response letter showing where each item in this correction letter is addressed on <br /> the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br /> the proposed structure will he constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Jeff Ilei, 11 <br /> Development Technician <br /> UQUVMNMM S1 N911:11 AIN IV"011 MOW."gn I <br />