Laserfiche WebLink
s <br /> COI,IPLIANCE � � ' � <br /> flEOUIRED <br /> INSPECTION IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br /> APPROVED PP Y <br /> circles. Disregard topics that don't describe your building or equipment. DO NOT place <br /> checks In the two left columns. <br /> a <br /> n <br /> ❑ ❑ ©Extarlor slab Insulation, it not located on the interior, shall be R-10(Table 6-2). <br /> ❑ ❑ ©i Exterior slab Insulation, it present,shall approved for below grade use and protected above grade. <br /> ❑ ❑ ©e Walls, ncfuding F Joists,shallbo insulated without compression to(Table 6.2) <br /> t�R-15 batt (1J t }Is I,Iq %. �i-19(Option III, IV,V,VI,VII) <br /> ❑ ❑ Qlnlerlor below grade walls sh@li be insulated without compression to (Table 6.2): <br /> QR-15(Options I,it) R-19(Options III,IV,V.VI,VII) <br /> ❑ ❑ QVaulted Collings shoal he Insulaled without Compression to R•30(Table 6.2,All oplions) <br /> ❑ ❑ Q Skylight wall Insulation is installed and equivalent to the required wall R-values above. <br /> ❑ ❑ Q Vapor retarders shall be Installed toward the warm surface as represented below(502.1.6): <br /> Select one option for floors,walls,and appropriate ceilings: <br /> Floors: Plywood Wi exterior giuo 0 Poly(> 4 Miq O Backed balls <br /> Walls: Poly plastic(x 4 Mil) O Face-stapled,backed balls O PVA.paint <br /> Ceilings: I Not required where ventilatio,l space averages>12'above insulation. <br /> Face stapled backed balls [Poly plastic(>- 4 ml) PVA paint <br /> ❑ ❑ Healing system efficiency and sizing requirements shall be met as represented below: <br /> ❑ ❑ Heat Pump efficiency shall be mal under file following compliance path{S.503.4): <br /> O Split system, air source heat pump:I•ISPF i 6.8, COP>3.0 <br /> O Single package, air source heat pump:HSPF i 6.6, COP>3.0 <br /> Q Water source heat pump:COP a 3.8 <br /> 0 Ground source heat pump COP> 3.0 <br /> ❑ ❑ QQ Central force-air furnace AFUE rating,as listed in the GAMA Directory, shall be: - <br /> 9Z .78(Options I, 11, IV,VI,VII) O a .88 (Option III)) , Ok,74(Option V) <br /> ❑ ❑ a <br /> Non-central, combustion heating systems shall have inlarmilent Ignition <br /> ❑ ❑ 7 Maximum heating system output (150%of design heat load) is BTUIhr. (S.503.22) <br /> ❑ ❑ e High efficiency forced-alr furnace (s 56,000 BTU/hr,outpul)may may exceed 150°/,ot DHL <br /> because: OGAMA listed AFUE is, 78+ 1 per each 5000 BTU/hr output that it exceeds the DHL.. <br /> L <br /> SEC lnsulatlon phase requirements: <br /> pected by: .__ Date <br /> G ❑ 0 Envelope Floors shall be Insulated without compression, and with support s-24"O.C.to:,- <br /> C)1`119(013001181, 11, <br /> orQR19(OptionsI, li, III,IV,V) , Q R25(Options VI, Vlq <br /> ❑ ❑ Jo Non.vaultod,attic Collings shall be Insulated without compression to See Table 6.2 <br /> OR-00(Options I, ll,ill, IV,V,Vlq Q R38 (Option VI) <br /> ❑ ❑ Q Door systems shall meet:0 U.40(Ali options) <br /> Door types are (1) (2) (3) <br /> Page 5 of 6 <br />