Laserfiche WebLink
r i <br /> 4. The ABU-66 post base specified relies on anchorage to the foundation for design <br /> bads. Specify connection of ABU-66 to the concrete footing. <br /> - A note has been added to the plan verifying the connection, please see <br /> revised plan. <br /> 5. The "roof eave detail" does not appear to appy to this structure; provide detail <br /> specific to this application. <br /> - The detal has been removed and addtbnal information has been added <br /> to the section providing connection and other detailed information. <br /> 6. Show beam of bearing wall between the laundry room and the house supporting 2x6 <br /> rafters. <br /> - The connection between the rafters and the house has been added to the <br /> plan, please see revised plan. <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your appicalbn VA be gNen priority and plan review will <br /> recommence. <br /> All required submittals shal be of sufficient dotal and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance wth al adopted codes. <br /> Sincerely, <br /> Jeff Heitman <br /> Development Technician <br /> 425-257-8976 <br /> Emal: dheiman(a)ci.everett.wa.us <br /> kdhanhIIMAWWIIIOILLg 4SIf to 99:1 (Y/ <br />