Laserfiche WebLink
CORRECTIONS FOR: JULY 1, 2004 <br />TYLER OLSON PROJECT <br />1329 63RD ST SE <br />1. SHOW HOLD DOWNS ON FOUNDATION PLAN. <br />NEW REVISED PAGE 4 - FOUNDATION PLAN. NOW SHOWING <br />HOLDOWNS. <br />2. PROVIDE SUPPORTS AT ENDS OF ALL BEAMS, <br />NEW REVISED FOUNDATION / FLOOR FRAMING PLAN NOW <br />SHOWING ALL ENDS OF BEAMS SUPPORTED. <br />3 PROVIDE THERMAL BREAK AT PERIMETER OF HEATED / NON -HEATED <br />SPACE. <br />ALI, HEATED SPACE NOW WITH CRAWL SPACE. PANTRY AREA <br />EVEN WITH REST OF LIVING SPACE. NO SPECIAL THERMAL <br />BREAK NECESSARY. REFER TO PAGE 3 : FLOOR PLAN. <br />CHANGE NOTED. <br />4 PROVIDE DETAIL OF NEW JOISTS INTO EXISTING FOUNDATION. <br />NEW REVISED PAGE 4 WITH NEW 43 DETAIL SHOWING TWO <br />OPTIONS FOR NEW JOISTS INTO EXISTING FOUNDATION. <br />5. LIGHT AND VENTILATION IN INTERIOR OFFICE ROOM. <br />USING R303.1. (2) ALTERNATIVE METHOD FOR LIGHT [VENTILATION. <br />1. LIGHT TO BE 6 FOOT CANDLES. <br />SSE (1) 100 WATT BULB LIGHT FIXTURE <br />OR (2) 60 WATT BULB LIGHT FIXTURE. <br />2. VENTILATION ®.35 CHANGES PER HOUR. <br />USE (1) 50 CFM FAN. (3,000 CU FT /HR) NEED 365 CE. FT./HR. <br />