Laserfiche WebLink
.0 . <br />0 <br />0 <br />9 <br />11 <br />r <br />0 <br />I <br />0 <br />117 <br />City of Everett <br />Improvement Plan Checklist <br />,Checklist Prepared By Date <br />W fs r'f11N -5v< <br />7-is- is)1 <br />Street and/or Storm Drain Improvements (1) <br />Plat or Project :'ilq 6 S5 r <br />✓ North Arrow <br />Scale Indicated (vertical and horizontal) <br />l"=40' horizontal and 1"=5' vertical, minimum <br />Names on all streets, centerline shown <br />v Indicate Right -of -Way and Improvement Widths <br />Indicate existing improvements with dashed lines <br />Show new improvements to be constructed with solid lines <br />Indicate all existing pipe lines, utilities, power poles, etc. <br />address all conflict points and indicate their disposition and by whom <br />Show centerline stationing (stationing is to run left to right) <br />N•A Indicate stationing for all beginning of curb returns (BCR's) <br />and ends of curb returns (ECR's) and BC's and EC's of all <br />centerline curves. <br />Indicate curve data on plans for centerline curves and curb returns <br />(Delta, Tangent, Radius, Length) <br />Indicate stationing at beginning and end of improvement work. <br />Indicate Top Curb (TO elevations at all BCR's and E-CR's and at <br />ends of existing curb and gutter that is being joined or matched <br />with new improvements. <br />Pavement flares to transition from existing E.P. to new improvements <br />are to be shown at 2:1 incoming and 5:1 outgoing. <br />N - h . Asphalt concrete transition ramps are to be shown at ends of new <br />sidewalk sections where sidewalk does not exist. <br />Indicate drainage patterns at both ends of new improvements and <br />work needed to insure existing drainage is not blocked. <br />