Laserfiche WebLink
iR/ <br />EC LOWHISE RESIDENTIAL COWL-11ANCE CHECKLIST <br />rically heated dwellings, s 3 stories, Zone 1, Western WshingtonMPORTANT: Please supply Information requested In the appropriate <br />haded boxes below. Disregard boxes that don't describe your building or <br />quipment. DO NOT place checks in the two left columns. <br />TION PHASE <br />�11 Walls(Including rim joists) will be Insulated without compression to: <br />Y,W -It] R-19 batt (Ch#6, options I,III,IV) ❑ R-24 (Ch N6,Oplion II) R-;�-L(Ch N 4 o(p <br />El Wow grade wells not Insulated on the exterior (See FOUNDATION PHASE) will be Insulated to: <br />❑ R-19(Chapter 6, all Options) on the Interior ❑ R-_ (Chapters 4, 5, or 7) on the Int ' r. <br />❑ suited ceilings will be Insulated without compression to: o <br />❑ R38(Ch N6, all options) ❑ R__(Ch #4 or 5) P •_ -� �— 1 <br />❑ ❑ Skylight wall Insulation Is Installed and equivalent to the required wall R• s <br />(Recommendation: place ceiling insulation baits In place behind skylight wells) <br />❑ Vapor retarders will be Installed toward the warm surface as represented below: <br />Select one option for floors, walls, and appropriate ceilings: <br />Floors: Plywood labeled EXPOSURE 1 W Poly (z 4 Mil) ❑ backed baits ❑ PVA <br />Walls: N Poly plastic (i 4 Mil) ❑ backed balls [4 PVA <br />Ceilings: Not required where ventilation space averages >12" above insulation. <br />Poly plastic ( 4 MID ❑ backed batts ❑ PVA <br />❑ Heating system efficiency and sizing requirements will be met as represented below <br />Maximum healing system capacity (150%of design heal load) has been calculated at �•y KW <br />Heat Pump efficiency will be met under the following compliance path: <br />❑ Ch N6, Option IV: air source heat pump: HSPF a 6.8 <br />❑ Ch #5 air source heat pump: HSPF 4,6:8, COP a 2.7/2.0 <br />❑ Ch #5 water source heat pump: GC�> 3.0 <br />Heating system requirements Wlti Is met with following system: <br />Mfr. Model N Max. Output -KW <br />Type HSPF COP_ <br />NWEC Insulation phase requirements: <br />Approved by: <br />Date <br />WEEK APRIL so <br />Page 6 of 7 <br />