My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
231 74TH ST SE 2018-01-02 MF Import
>
Address Records
>
74TH ST SE
>
231
>
231 74TH ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 11:48:36 AM
Creation date
4/17/2017 11:08:33 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
231
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPAIR SPECIFICATIONS AND LIST OF WORK TO BE BID <br />Date: 8-26-86 <br />Owner(s): Charlie s Linda Hustace <br />Address: 231 74th Street <br />Phone: 353-8720 <br />UdY Lvening <br />Legal Description: <br />The South 65 feet of the East 114 feet of Lot 10, Beverly Acreage Tracts, <br />according to the plat thereof recorded in Volume 10 of Plats, page 50, <br />records of the Auditor of the County of Snohomish, State of Washington. <br />E=PT that portion thereof as conveyed to tie City of Everett by Deed <br />recorded under Auditor's File No. 2250106. <br />GENERAL REQUIREMENTS <br />1. All work noted herein must comply with the standards set forth in the Building <br />Codes and Ordinances of the City of Everett. <br />2. All material and permits required for this job shall be provided by the awarded <br />contractor and permits shall be posted prior to start of work. <br />3. All work is to be performed in accordance with the "Standard Specifications for <br />Contracts for Residential Rehabilitation." In any conflict of the specifications <br />of this document with "Standard Specifications", the specifications of this <br />document shall govern. <br />4. The Property Owner shall make no oral commitments or agreements with the Contractor <br />pertaining to this work. Any changes in the work shall be made by an Addendum or <br />Change Order and signed by the Owner. the Contractor and the Community Housing <br />Improvement Program Representative. <br />5. The premises shall be kept clean and orderly every day during the course of the <br />work, and all debris resulting from work shall be removed weekly and upon comple- <br />tion of the work. <br />6. The Property Owner will/will not occupy premises for days during the course <br />of the work. <br />7. Products or materials specified by brand name in the List of Work to be Bid may <br />be substituted by products or materials of equal quality only if approved by the <br />owner in writing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.