My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2409 74TH ST SE 2018-01-02 MF Import
>
Address Records
>
74TH ST SE
>
2409
>
2409 74TH ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 12:57:53 PM
Creation date
4/17/2017 11:09:26 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
2409
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR THE DEVELOPER <br />Planning Department comments <br />I. If a complete application has not been filed for a building pemtit or equivalent construction <br />pennit within eighteen (18) months from the approval date of this decision, the permit shall be <br />deemed terminated, unless an extension is granted. If the permittee requests an extension in writing <br />not later than eighteen (I8) months from the land use pennit date, the Director may grant a six (6) <br />month extension. <br />2. This is an administrative decision that may be appealed to the City's Land Use Bearing <br />Examiner. An appeal must be filed with the City within 14 days of the date of this notice. If you <br />have questions regarding this proposal or if you wish to file an appeal, please contact Niels Tygesen, <br />City of Everett Planning Department, at 425.257.8731. <br />Public Services/Engineering comments <br />3. If this structure is used for the operation of a home -based business additional traffic impact <br />review will be required. <br />4. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br />5. This project must comply with the current City of Everett Building Code and Sprinkler <br />Ordinance. Will require a building pennit. <br />6. Approval of construction plans will require demonstration that all pertinent standards and <br />regulations are met. <br />7. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br />Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br />8. Lack of comment on the plans submitted with the application does not constitute approval of <br />these plans. <br />2' ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.