My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
423 75TH ST SE 2018-01-02 MF Import
>
Address Records
>
75TH ST SE
>
423
>
423 75TH ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 4:23:42 PM
Creation date
4/18/2017 12:11:54 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
423
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. STRUCTURAL STEEL: <br />1. All steel, except pipe: ASTM A-36. <br />Pipe: ASTM A-53, type E or S. Grade H. <br />All bolts ASTM A-307/ASTM A-325. <br />2. All fabrication, erection and detailing in accordance with <br />the latest edition of the "Manual of Steel Construction" of <br />the American Institute of Steel Construction. <br />3. All welding by certified welders in a-cordance with the <br />"Welding Handbook" by the American Welding Society. <br />4. All welds 3/16" min. continuous fillet welds using AWS A5, <br />E70XX electrodes. <br />Weld beam hanger assemblies with continuous 1/4-inch fillet <br />welds on one side of each component. <br />5. Provide washers and lock washers on bolted connections. <br />6. All steel not emhedied in concrete or masonry to receive <br />one shop coat of .n approved primer paint. Apply two coats <br />of heavy asphaltic paint to all steel exposed to earth. <br />7. Furnish complete shopdrawings prior to fabrication. <br />8. Metal roof deck fabricator to submit shopdrawings showing <br />layout, welding patterns at sunports, perimeter and ride <br />laps,,thus providing a diaphragm capable of resisting <br />1st ral shear forces as shown. Provide steel headers at all <br />oYings through the deck to ratirfactortly distr:�ute the <br />:oad to supporting members. <br />I. MISCELLANEOUS: <br />1. Contractor to verify al; dirensions in the field. <br />2. Verify size and location of n11 nnenings in floor, ro f <br />and walle with mechanical and electrical work. <br />?. Provide temporary bracing ap required until all permanent <br />connections and :tiffeniner have teen installed. <br />4. Pre -fabricated Items to be .iand'ed and installed per mfr's <br />recommendations. <br />- r, - <br />
The URL can be used to link to this page
Your browser does not support the video tag.