Laserfiche WebLink
- , - . � ����o�� <br />,o Bob Landles, Plann�ng Department �j /���f� �dAY 2 9 1980 <br />,� � � � �� �v ,7 <br />fPOM Public Works Department �'� � � <br />, CITY OF EVERETT <br />o.TE May 27, 1980 Planning Uept. <br />suu�ccr S.E.P.A. Checklist Review p215 cnro� eveae�*,e:%iu>> �'���������o� <br />Planning File 1I80-35 <br />PROPOSAL: <br />To construct a nine unit apartmert bvilding at 632 - 75th Street. <br />PROPONENT: RAM Enterprises <br />RECOMMENDA"i IONS: <br />It is the recommendatio� of the Public Works Department that issuance oi <br />a Negative Declaration be subject to the following: <br />1. A detailed drawing shall be submitted to the Fublic Works Department <br />showing parking layout, landscaping, driveways,'utilities, storm drainage, <br />and all required improvements to the public right-of-way. Public Works <br />Department approval of these drawings is required before any permits <br />are issued. All improvements shall be completed before the Occupancy <br />Permit is issued. <br />2. City streets are to be kept clear of dirt and debris during construction. <br />3. During construction, alt truck traffic to and from the site within the <br />City ui Everett shall be on arterial streets unless otherwise approved <br />by the Public Works Department. <br />4. Street improvements and a Covenant oi no-protest for a Local (mpruvement <br />District in conformance with city ordinances are required. <br />' S. Ten feet of additional right-of-way along the frontage of the site on <br />' 75th Street shall be deeded to the City of Everett. <br />,6. Participation in the prograrn to fund the north and south centralsanitary <br />sewer interceptor is required. <br />7. On-site detention is required. Draina�e calculations are tu be submitted <br />� on a City of Lverett drainage plan submission form. <br />$. Public Works Department approval of a temporary erosion control plan <br />�' is required prior tu commencing construction activities. <br />9. Reseeding of exposed soils within 30 days ot construction completion <br />is required. <br />Amc�d Checklist As Pollows <br />1[- 13- c, d and i- change to yes. <br />KG:jcl <br />