My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1122
>
1122 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 7:47:49 AM
Creation date
4/18/2017 12:33:01 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31. The Snohomish County PUD currently has sufficient capaciLy to <br />serve the proposed development. For information about the <br />electrical service requirements for this project, Please call <br />Kurt Martin of the Distrint's Customer Engineering Office, <br />Everett at 258-8291. <br />32. GTE NorthneWttelephoneacableiconstrucit onswill�ebe requiredtin <br />However, <br />conjunction with the site develop�muT construction9schedulesWand <br />begin when thuiremer�ts tified of y <br />telephone req <br />It will be the developer's responsibility to provide a suitable <br />combination of condui!: and trenching and/or riser conduit to <br />accommodate GTE�s network communications cable within the <br />complex. Provided that an acceptable combination i°,o ect du�t� <br />qpd/or trenching are incorporated into the p � <br />accommodate GTE's entrance cable, there will be no costs to the <br />developer for GTE's cable. <br />If a rearrangement of existinq cables on premise or on the <br />ri.ght-of-way is necessary, ePPropriate charges will be estimated <br />and GTE's Guaranty of Payment form will be forwarded to you for <br />your signature. Prior to og�enWilln bef requiredngln To innsure <br />such rearrangement, a dep 3a s lead <br />timely telephone servicero urementlle and installation of cablP <br />time for enqineeiiment p <br />and/ or GTE�s eq p <br />youarequireaadditional informationr Engineer, at 356-4052 should <br />33. The Hashington State Clean Air Act requires the use of all <br />known, available, and reasonable means of controlling air <br />pollution, including dust. Dust generated durinq construction <br />activities can be controlled by wettinq those dust sources such <br />as areas of exposedanailinstalliny ard k maint ining r gravel <br />leave the site, <br />construction entrances. Construction vehicle track-out is a so <br />a major dust source. An�' evi�ience of track-out cT therPuget <br />violations and fines from the Department of EcologSEPA Natural <br />Sound Air Pollution Control Agency. ( <br />Environment/Air Quality Policies) <br />34. A Fire Department permit is required for i�istallation of <br />underground fuel tanks. <br />�5, If any maintenance of vehicles occur on t Section�4.7h 7 oftthe <br />standard for auto repair/maintenance shops, <br />Design and Construction Standards and Specifications must be <br />met. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.