My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1122
>
1122 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 7:47:49 AM
Creation date
4/18/2017 12:33:01 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONBTROCTION OF VEGETATED BWALEB: <br />Prepare the swale fcr sod immediately after it has been <br />graded. Roughen the bottom and sides of the swale by <br />raking, place 4" (minimum) of topsoil, an3 fertilize with an <br />appropriate fertilizer at the rate of 7 lbs per 100o square <br />feet before laying the sod. In general, use a 10-20-20 (N- <br />P-K1 fertilizer. However, use a non-phosphorus containinq <br />-' •---- <br />ON TE: Topsoil shall meet the standard for Topsoil Type A, <br />as specified in section 9-14.1(1) of the 1991 Standard <br />Specifications for Road, Bridge, and Municipal Construction <br />(WSDOT, APWA) with the followinq modification - 100$ of the <br />topsoil shall pass throuqh a 1/2" sieve. <br />Sod the swale immediately after the sides and bottom of the <br />swale have been prepared. Lay sod to a minimum of 1.0 feet <br />of vertical depth above the bottom of the swale. Anchor the <br />sod in place in the bottom of the swale and to 3..0 feet of <br />vertical depth above the bottom of the swale with stakes, <br />metal staples or other means. <br />ON TE: Lay the sod pieces with their long axie perpendicular <br />to the direction of flow in the swale, and staqger the <br />pieces to avoid a continuous lonqitudinal seam in the bottom <br />of the swale. <br />Hand-seed or hydroseed the swale with the specified seed mix <br />in addition to sodding. If the swale is cor�pleted between <br />April 1 and September 1, hand-seed the swa.le immediately. <br />If the swale is completed between September 1 and April 1, <br />hand-seed after April 1, but before April 30, of the spring <br />following completion. Disperse 5 lbs of seed per 1000 <br />square feet evenly over the saci and all bare areas of the <br />swale. <br />To plant wetland veqetation required for biofiltration <br />swales, punch holes in the sod with a bar or stake <br />approximately equivalent to the diameter of the plants� root <br />wads. Insert the plants in the holes and tamp the sod and <br />earth down around the plants. Locate the plants in the <br />otto of the swale only and in a staggered pattern - not in <br />a straight line. <br />HOTE: Wetland vegetation planted after March 15 will <br />require irrigation through the first summer to ensure plant <br />viability. Wetland Dlants ideallv should be ulanted batween <br />Oatohsc and March. <br />
The URL can be used to link to this page
Your browser does not support the video tag.