Laserfiche WebLink
0'Donnell-Brigham Partners, N. W. <br />August 11, 1981 <br />Page Three <br />Re: Everett Industrial Center <br />Also, the Koll Company deposited a check in the amount of 510,000.00 in <br />lieu of an assignment of a savin9s account as a performance bond. <br />Prior to the installation of the storm drainage system, the sanitary <br />sewer system and the connection to the City of Everett system, the following <br />fees shall be paid: <br />Sewer Development Fees per Ordinance 715-&0 and Item No. 5 <br />of your FINAL DECLARATION OF NOtJ-SIGNIFICANCE: <br />� <br />Duilding IJo. F3 (1120 - 75th St. SSJ) $ 2G8.10 <br />Iluilding No. 9(1G20 - 75th St. SW) 311.79 <br />Puilding Plo. 10 (1520 - 75th St. SW) lOC2.00 <br />Ouilding I;,. 11 (1420 - 75th St. SW) a62.21 <br />auilding No. 12 (13Z0 - 75th St. SW) 1117.71 <br />Duilding No. 13 (1220 - 75th St. SW) 6�9.30 <br />for a total of $3871.11 in Sewer Development fees. <br />ALSO: There are sewer connection charges per building <br />as follows: <br />Duilding No <br />duiiding No <br />auilding No <br />^ �lding No <br />Duilding ��o <br />�uilding No <br />8 (235 ft x $4.40) <br />9 (310 ft x 54.40) <br />10 (340 ft x $4.40) <br />11 (355 ft x $4.40) <br />12 (4�0 ft x $4.40) <br />13 (250 ft x $4.40) <br />1034.00 <br />1364.00 <br />1496.00 <br />1562.00 <br />1936.Q0 <br />1100.00 <br />for a total of St1492.00 for sewe�� connection charyes. <br />5 S5�S7� <br />,SS s� S 3 <br />,S-ty�y <br />S3�/s.s' <br />,� Sys' G <br />� SS/s7 <br />/y9'7�-y <br />i y99/- � <br />/4'9%6-P <br />/y9v9- c <br />/v9�8-z <br />/ /%G 7- 7� <br />�-� �o%N�S� <br />��� <br />1 <br />� <br />� <br />