Laserfiche WebLink
0'Donnell-Brigham Pai•tners, N. W. <br />August 11, 1981 <br />Page Four <br />Re: Everett Industrial Ce^tcr <br />Sewer permits shall be obtained for each of the structures as follows: <br />duilding No. 8 b90.00 <br />(1 connection and 6 catch basins) <br />Duilding No. 9 60.00 <br />(1 connection and 3 catch basins) <br />6uilding No. 10 <br />(1 connection and 6 catch basins) <br />Building No. 11 <br />(1 connection and 5 catch basins) <br />auilding No. 12 <br />(1 connection and 5 catch basins) <br />�uilding No. 13 <br />(1 connection and 3 catch basins) <br />for a total of 5460.�0 for sewer perniits. <br />90.00 <br />E0.00 <br />80.00 <br />60.00 <br />Thc total balance that is owing for all sewer development fees, sewer <br />connection charges and sewer permits is 512,823.11. <br />Prior to any plumbing, mechanical or electrical work being done on this <br />project, it shall be the responsibility of the respective contractors to <br />make application to this office and submit 2 sets of prints covering their <br />respective work. This office will check tlie plans for compliance with the <br />applicable codes and issue the permits to commence work. Upon the issuance <br />of the pe�mits, one set of approved plans shall be returned to the cuntractor <br />and shall be kept on the job at all times. <br />It has been a pleasure working with you and Harvey Nelson of the Koll Company <br />and, if there are any further questions, do not hesitate to contact me <br />either in person or telephone (259-t3145). <br />Respectfully, <br />Larry Callahan <br />Office Supervisor <br />1 <br />� <br />J <br />