My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1720
>
1720 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 9:01:00 AM
Creation date
4/18/2017 1:10:04 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction lnepection B Related 'Tests <br />Carlson Construction Consultants, Inc. <br />P.O. BOX 25732 — LAKE CITY STATION <br />SEATTLE, WASHINGTON 98125 <br />PHONH (2061 364.0500 <br />March 25, 1982 <br />3C-2587A <br />DAILY FIELD INSPECTION REFORTS - WELDING <br />DATE COVERED: March 25,1982 <br />FR03ECT: O'Donnell Business Park <br />ADDRESS: 1320 75th St. S.W., Everett <br />CONTRACTOR: The Kell Company <br />C. D. BROWN - 3i25I82: Performed visual inspection of welding of all precast <br />wall ;anel to lenel connections for bldt•s. 8, 9, 10, 11, 12, 13 with results <br />as follows: <br />Bldg. #8 - All completed satisfactorily <br />Bldg. #9 - All completed satisfactorily with exception of missing embedments at 5' <br />level at the northwest and southwest building corners. <br />Bldg. ,#10- All completed satisfactorily with exception of missing embedment at <br />5' level at lines C minus 5'-5 and at the 10' level at lines F-4.5 and <br />F-5 (southeast corner). <br />Bldg. #11- All completed satisfactorily with exception of missing embedments at <br />the 5' level at the southwest building corners and missing embedments <br />at the 15' and 20' level of interior fin panel at lines A.55-1 <br />Bldg. #12- All completed satisfactorily with exception of missing embedments at <br />the 20' level for precast interior fin panel at'line6 B.35-1. <br />Bldg, #1.3- All completed satisfactorily. <br />All welding was performed by WABO certified welders Clinton West, Stanley Hosby, <br />and Thomas Carmigani unin_ E7018 electrodes. <br />FRANI; W. CARLSON <br />Cc: City of Everett <br />mw 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.