My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1802
>
1802 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 11:50:17 AM
Creation date
4/18/2017 1:23:16 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1902
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2320 California St„ Everett, Washington 98201 258-8211 <br />Mailing Address: P. 0. Box 1107, Everett, Washington 98206 <br />April 6, 1979 <br />Mr. Ken Callahan, Plans Examiner <br />City of Everett Building Department <br />3002 Wetmore <br />Everett, Washington 98201 <br />Dear Mr. Callahan: <br />The Snohomish County P.U.D. No.1 has released the final construction <br />drawings for the new Operations Center. Forwarded herewith are the following <br />documents: <br />1) 2 complete sets of construction drawings <br />2) 1 project specification manual <br />3) 1 set of structural calculations <br />4) 4 separate sets of civil drawings <br />5) A copy of the District's bid notice for Public Works <br />Contract No. 241 <br />As you may know, the District is releasing the bid notice on April 6 <br />with the bid opening scheduled for May 11, 1979 In addition, the architect <br />(Mr. Jerry Ruhl, IINTB) has scheduled the publishing of contract addendum by <br />April 30, 1979, which will require that any major changes be brought to the <br />District's attention not later than April 20, which would allow INTB one week <br />to change the contract documents. Essentially then, any major problems you <br />may find during your first week with the drawings and specifications should <br />be directed to may attention during the week of April 16. Should you desire <br />to have the architect or members of his staff review your comments with the <br />Building Department staff, please advise my office (258-8604) and I'll arrange <br />the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.