Laserfiche WebLink
J <br />Mr. Ken Callahan, Plans Examiner <br />City of Everett Building Department <br />April G, 1979 <br />Page 2 <br />The following tabulation summarizes my understanding of the City's <br />building permit and plan check fees: <br />Assuming an estimates construction cost of $10,000,000: <br />1) Building permit: <br />$887echarge <br />000for <br />the <br />thefconstructionirst Ocostsover t$500,OOO.lus <br />$1 p $ , <br />$887 + $9 500 000 . $887 + $9,500 = $10,387 <br />1,000 <br />2) Plan check fee: 65'% of the building permit foe = $.65($10,387) _ $6,751.55 <br />3) Mechanical and Electrical fees to be determined upon <br />plan review <br />I understand you prefer the plan check fee with the drawings and all <br />other building permit and mechanical/electrical fees upon delivery of the <br />City's building permit to the District. <br />ce leaseto find enclosed th for District's <br />check No. 91545 in the $6,751.55, Payable <br />plan checking. cous <br />se call <br />in any <br />Thank you for your court <br />houldssomeainformatPonnce and ameor otherissistancc <br />matter connected with yreview <br />be deisred. <br />Very r �lyours, <br />Charles A. Lang <br />Project Manager <br />Operations Center <br />