My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3813
>
Resolutions
>
Resolution 3813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 10:24:07 AM
Creation date
4/18/2017 10:24:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3813
Date
7/28/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 1 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m o L t FEDERAL FUNDING <br /> N i A.PROJECT TITLE p t o 1 C EXPENDITURE SCHEDULE <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal LOCAL RAP TOTAL (Local Agency) <br /> T I r C.TERMINAL BEGINNING AND END o y I g I d PHASE YEAR Cost Fund CAPP FUNDS 4th, <br /> N a i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd 3rd 5th, <br /> L s t o .e h y s STARTS Phase UATA 8th, <br /> s y OTHER <br /> 1 2 3 4 5 6 7 8 9 10 11' 12 13 14 15 16 17 <br /> 14 1 A.ALVERSON BRIDGE 09 0.2 C PE <br /> B.SR 529;WEST MARINE VIEW DRIVE P R/W 985 0-415 1400 1400 <br /> C.10TH STREET TO ALVERSON BLVD. 0 CONST 7/92 <br /> D.CONSTRUCT REPLACEMENT BRIDGE T TOTAL <br /> 14 2 A.SR 526/INTERSTATE 5 INTERCHANGE 06 0.5 00 PE 1/92 1250 STP(L) <br /> B.INTERSTATE 5,SR 526 01 R/W 11000 12250 8000 3000 <br /> C.EB SR 526 AT EVERGREEN TO NB I-5 AT MP 190 17 CONST 3/94 <br /> D.DESIGN AND CONSTRUCT NEW RAMP EB SR 526 TO NB I-5 TOTAL 1250 <br /> 14 3 A.PAINE FIELD BLVD./SR 525 CORRIDOR PROJECTS 01 5 C PE 12/91 1027 STP(L) <br /> B.PAINE FIELD BLVD.;SR 525 05 P R/W 8/94 1000 STP(L)• 10600 O,T-57873• 71500 6000 10000 20000 33000 <br /> C.SR 525,BETWEEN SR 526 AND SR 99 06 O CONST 8/95 1000 STP(L)• <br /> D.NEW ALIGNMENT;ROADWAY IMPROVEMENTS;NEW INTERCHANGE 14 T TOTAL 3027 <br /> 14 4 A.EB SR 526 TO SB 1-5 HOV LANE 02 3.5 00 PE 9/93 400 CMAQ <br /> B.SR 526,INTERSTATE 5 12 R/W 2100 3500 2700 <br /> C.EB 526 AT EVERGREEN WAY TO SB 1-5 AT 128TH STREET SE 18 CONST 6/94 1000 STP(C) <br /> D.DESIGN AND CONSTRUCT HOV LANE FOR P.M.PEAK TRAFFIC 21 TOTAL 1400 <br /> 14 5 A.19TH AVENUE SE(SR 527) 02 1 C PE 1/93 <br /> B.19TH AVENUE SE,SR 527 05 P R/W 9/96• 1216 T-6584 7800 250 500 1300 5500 <br /> C.112TH STREET SE TO 132ND STREET SE 06 0 CONST 3/97* <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS 14 T TOTAL <br /> 14 6 A.EAST MARINE VIEW DRIVE 02 0.9 C PE 9/93 250 STP(L)* <br /> B.EAST MARINE VIEW DRIVE,SR 529 05 P R/W 3/94 230 DOD* 0-1200 3113 2450 450 <br /> C.ALVERSON BRIDGE TO NORTH BROADWAY 06 T CONST 7/94 1433 STP/DOD• <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS 14 TOTAL _ 1913 <br /> •A portion or all of the funding for these project phases has not yet been committed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.