My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3813
>
Resolutions
>
Resolution 3813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 10:24:07 AM
Creation date
4/18/2017 10:24:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3813
Date
7/28/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 2 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> P PROJECT IDENTIFICATION I T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> r m o L t FEDERAL FUNDING <br /> i A.PROJECT TITLE p t o I C EXPENDITURE SCHEDULE <br /> C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal LOCAL RAP TOTAL (Local Agency) <br /> 1 r C.TERMINAL BEGINNING AND END o y I g I d PHASE YEAR Cost Fund CAPP FUNDS 4th, <br /> a i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd 3rd 5th, <br /> s t o .e h y s STARTS Phase UATA 6th, <br /> s yOTHER <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br /> 14 7 A.EVERGREEN WAY IMPROVEMENTS 02 0.5 C PE 10/93 <br /> B.EVERGREEN WAY,FAS NO.2791 04 P R/W 1/94 189 U-478 665 605 <br /> C.75TH STREET TO SR 526 05 0 CONST 6/94 <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES 06 T TOTAL 0 <br /> 14 8 A.EVERGREEN WAY IMPROVEMENTS 02 0.5 C PE 12/93 46 STP(L) <br /> B.EVERGREEN WAY,FAS NO.2791 04 P Ft/W 3/94 101 STP(L) 1023 1170 780 380 <br /> C.MADISON STREET TO 75TH STREET 05 0 CONST 9/94• <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES 06 T TOTAL 147 <br /> 14 9 A.EVERGREEN WAY IMPROVEMENTS 02 1 C PE 12/93 115 STP(L) <br /> B.EVERGREEN WAY,FAS NO.2791 04 P R/W 3/94 202 STP(L) 2424 2741 1827 900 <br /> C.52ND STREET TO MADISON STREET 05 0 CONST 9/94• <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES 08 T TOTAL 317 <br /> 14 10 A.WEST MARINE VIEW DRIVE 03 0.8 C PE 2/94 105 STP(L)` <br /> B.WEST MARINE VIEW DRIVE,SR 529 04 P R/W 4/94 60 STP(L)* 700 1400 1200 200 <br /> C.10TH STREET TO 18TH STREET 05 0 CONST 9/94 535 STP(L)* <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS 06 T TOTAL 700 <br /> 14 11 A.SR 526/EVERGREEN WAY/CASINO RD INTERCHANGE IMP. 04 0.1 C PE 9/93 <br /> B.SR 526 AT EVERGREEN WAY;EVERGREEN WAY AND CASINO RD 11 P R/W 400 400 400 <br /> C.EVERGREEN WAY FROM SR 526 TO CASINO ROAD 14 T CONST 6/94 <br /> D.DESIGN AND CONSTRUCT INTERCHANGE/INTERSECTION IMP. TOTAL _ . <br /> 14 12 A.SR 525 HOV LANES 02 2.6 C PE 3/93 <br /> B.SR 52512 P R/W 2000 0-9000• 11000 400 3000 4600 2500 <br /> C.SR 99 TO INTERSTATE 5 17 T CONST 10/95 <br /> D.DESIGN AND CONSTRUCT ARTERIAL HOV LANES(WSDOT) 18 TOTAL 0 <br /> •A portion or all of the funding for these project phases has not yet been committed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.