Laserfiche WebLink
• <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 3 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION 1 T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m o L t FEDERAL FUNDING <br /> N 1 A.PROJECT TITLE p t o I C EXPENDITURE SCHEDULE <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal ' LOCAL RAP TOTAL (Local Agency) <br /> T I r C.TERMINAL BEGINNING AND END o y I g I d PHASE YEAR Cost Fund CAPP FUNDS 4th. <br /> Na i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd• 3rd 5th, <br /> L s t o .e h y s STARTS Phase UATA 6th, <br /> s y OTHER <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br /> 14 13 A.EVERETT AVENUE/SR 2 ON-RAMP STUDY 03 00 00 PE 2/94 476 STP(L)* <br /> B.EVERETT AVENUE(SR 529),SR 2 14 R/W 82 558 50 254 254 <br /> C.EVERETT AND WALNUT;SB 1-5 OFF-RAMP TO EB SR 2 17 CONST <br /> D.STUDY FEASIBIUTY OF ON-RAMP FROM EB EVERETT TO SR 2 TOTAL 476 <br /> 14 14 A.I-5/12TH STREET NE INTERCHANGE STUDY 11 00 00 PE 2194 260 STP(L)* <br /> B.INTERSTATE 5,12TH STREET NE 14 R/W 40 300 100 100 100 <br /> C.1-5/12TH STREET NE OVERCROSSING CONST <br /> D.STUDY FEASIBIUTY OF INTERCHANGE ATI-5 AND 12TH TOTAL 260 <br /> 14 15 A.PAINE FIELD BLVD.EXTENSION AUGN.&ENVIRON.STUDY 01 00 00 PE 2/95* <br /> B.PAINE FIELD BLVD. 08 R/W 300 300 100 100 100 <br /> C.SR 526 TO MUKILTEO WATERFRONT 10 CONST <br /> D.ALIGN.&ENVIRON.STUDY OF JAPANESE GULCH ARTERIAL 14 TOTAL <br /> 14 16 A.MUKILTEO BLVD./41ST STREET CORRIDOR AND PEDESTRIAN STUDY 05 00 00 PE 2/95* <br /> B.MUKILTEO BLVD.,FAS NO.2776 06 R/W 100 100 100 <br /> C.BROADWAY TO DOGWOOD/OLYMPIC 12 CONST <br /> D.PREUMINARY URBAN DESIGN STUDY AND ENVIRONMENTAL REVIEW 13 TOTAL <br /> 14 17 A.41ST STREET RAMP/INTERCHANGE IMPROVEMENTS 03 0.1 00 PE 5/95 200 STP(L)* <br /> B.41ST STREET.FAS NO.2776 14 R/W 200 1500 230 1270 <br /> C.BROADWAY TO INTERSTATE 5 CONST 2/96 1100 STP(L)* <br /> D.RAMP IMPROVEMENTS TOTAL 1300 <br /> 14 18 A.41ST STREET IMPROVEMENTS 02 0.1 C PE 5/95 60 STP(L)* <br /> B.41ST STREET.FAS NO.2776 05 P R/W 8/95 500 SW(L)* 260 2000 644 1356 <br /> C.RUCKER TO FRIDAY AVENUE 06 0 CONST 2/96 1180 STP(L)* <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS 14 T TOTAL 1740 <br /> *A portion or all of the funding for these project phases has not yet been committed. <br />