Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 6 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC • <br /> VICINITY IMPROVEMENTS Resolution No. <br /> P PROJECT IDENTIFICATION I T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> r m o L t FEDERAL FUNDING <br /> i A.PROJECT TITLE p t o i C EXPENDITURE SCHEDULE <br /> C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal LOCAL RAP TOTAL (Local Agency) <br /> I r C.TERMINAL BEGINNING AND END o y I g i d PHASE YEAR Cost Fund CAPP FUNDS 4th, <br /> a i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd 3rd 5th, <br /> s t o .e h y s STARTS Phase UATA 6th, <br /> r _OTHER <br /> s y, <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br /> 19 1 A.ANNUAL STREET OVERLAY PROGRAM 04 00 00 PE <br /> B.VARIOUS STREETS WITHIN THE CITY LIMITS R/W 3473 6500 1500 1000 1000 3000 <br /> C.IBID. CONST 5/94 3027 STP(L)* <br /> D.STREET RESURFACING TOTAL - <br /> 19 2 A.REGIONAL TRAIL SYSTEM 05 00 00 PE 3/93 934 STP(L)* <br /> B.HARBORFRONT,RIVERFRONT,INTERURBAN,SILVERLAKE, 12 R/W 9/94 505 STP(E)* 2330 10430 4245 1385 1775 2020 <br /> BOEING COMMUTER ROUTES,LANGUS LOOP C.VARIOUS LOCATIONS. 17 CONST 3/95 6661 CMAO* „ <br /> D.DESIGN AND CONSTRUCT PED/BIKE PATHS,BIKE LANES _TOTAL 8100 <br /> 19 3 A.COMMUNITY TRAIL SYSTEM 05 00 00 PE 9/94 184 STP(E&L)• , <br /> B.PIDGEON CREEK NOS,162,SOUTHEND,SW EVERETT,LOWELL, 12 R/W 11/94 64 STP(E&L)• 852 4260 310 950 1000 2000 <br /> POWDERMILL GULCH,NARBECK CREEK C.VARIOUS LOCATIONS 17 CONST 7/95 3160 STP(E&L)* • <br /> D.DESIGN AND CONSTRUCT PED/BIKE PATHS,BIKE LANES TOTAL 3408 <br /> 19 4 A.NEIGHBORHOOD TRAIL SYSTEM 05 00 00 PE 2/94 <br /> B.VARIOUS LOCATIONS IN EVERETT NEIGHBORHOODS 12 R/W 5/94 150 150 25 25 25 75 <br /> C.IBID. 17 CONST 8/94 <br /> D.DESIGN AND CONSTRUCT PED/BIKE PATHWAYS TOTAL <br /> 19 5 A.NEIGHBORHOOD MITIGATION SIGNAL PROJECTS 05 00 00 ' PE 3/93 17 CMAQ <br /> B.SEVEN LOCATIONS WITHIN THE CITY LIMITS 12 R/W 9/94 170 507 250 <br /> C.IBID. 17 CONST 3/95 320 CMAQ <br /> D.DESIGN AND CONSTRUCT PED AND VEHICLE SIGNAL IMPR. TOTAL 337 <br /> 19 6 A.NEIGHBORHOOD TRAFFIC MITIGATION PROJECTS 05 00 00 PE <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 06 R/W 2083 2083 417 417 417 832 <br /> C.IBID. 12 CONST 5/94 <br /> D.INSTALL TRAFFIC CONTROL ENHANCEMENTS IN NEIGHBORHOODS 14 TOTAL <br /> 19 7 A.BOEING MITIGATION PARK AND RIDE LOT PROJECTS 18 00 00 PE <br /> B.VARIOUS LOCATIONS INSIDE AND OUTSIDE CITY UMITS 21 R/W 2/94' 181 STP(L)* 52 390 290 50 50 <br /> C.IBID. 22 CONST 5/94 157 STP(L)• <br /> D.ESTABLISH P/R LOTS TO SERVE SW EVERETT COMMUTERS TOTAL _ 338_ <br /> •A portion or all of the funding for these projects has not yet been committed. <br />