Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 5 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC COLLECTOR ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m o L t FEDERAL FUNDING <br /> N i A.PROJECT TITLE p t o i C EXPENDITURE SCHEDULE <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal LOCAL RAP TOTAL (Local Agency) <br /> T I r C.TERMINAL BEC INNING AND END o y I g i d PHASE YEAR Cost Fund CAPP FUNDS 4th, <br /> N a i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd 3rd 5th, <br /> L s t o .e h y s STARTS Phase UATA 6th, <br /> s y. .• OTHER <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br /> 17 1 A.75TH STREET IMPROVEMENTS 03 0.8 C PE 6/95 <br /> B.75TH STREET,FAS NO.2784 05 P R/W 10/95 340 U-1360• 1700 340 1380 <br /> C.BEVERLY BLVD.TO BEVERLY LANE 12 0 CONST 4/96 <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS T TOTAL - <br /> 17 2 A.7TH AVENUE SE DESIGN STUDY 03 0.9 C PE 4/94' <br /> B.7TH AVENUE SE,FAS NO.2599 04 P R/W 30 30 30 <br /> C.EVERETT MALL WAY TO CASINO ROAD 05 0 CONST <br /> D.STUDY TO DETERMINE ULTIMATE DESIGN OF 7TH AVENUE 14 T TOTAL _ , <br /> •A portion or all of the funding for these projects has not yet been committed. <br />