Laserfiche WebLink
• <br /> COMPLIANCE <br /> REQUIRED <br /> 0 <br /> + is ac• +��_ <br /> INSPECTION IMPORTANT: DD_No T place checks In the two le@ columns. <br /> APPROVED <br /> O 0 Qz Exposed foam Insulation shall comply as follows (S. 502.1.4.7): <br /> ❑ Protected with meta!„r plastic flashing,or other suitable material that extends below g, <br /> ❑ Insulation is approved for sub-grade, exterior use and properly Installed. <br /> p 0 E)Alrflow between fresh air ports and the whole-house tan ensured by undercut doors/grill;(VIAO,S.302.6.4) <br /> p 0 ®Looseflll Insulation OK if (S.502.1.4.5): <br /> ❑ maximum ceiling slope not > 3 in 12 <br /> ❑>30"of clear distance from top of bottom chord to underside of roof sheathing at the :cof ridgrr. <br /> GF1p 6 mll black polyethylene ground cover, shall be lapped 12" at joints and extend to foundation wall <br /> Q O s Clearances shall meet listed minimums between insulation and (S.502.1.4.3): <br /> ❑chimney ❑Non-IC rated recessed lights: 1/2" to combustables, 3"to insulation. <br /> O O z Attic hatch shall be insulated to required ceiling R-value and is weatherstripped (S.502.1.4.4) <br /> U p Attic access shall have wood dam or equivalent to retain loose fill Insulation in attic(S. 502.1.4.4) <br /> CD 0 9 All exterior doors (e::cept 20 minute doors) shall be weatherstripped (S. 502.4.3). <br /> c0 O 0 Service hot & cold w3ler piping !n unconditioned spaces shall be Insulated to R-3(S.503.11) <br /> CO2 r Service recirculation hat water piping in unconditioned spaces shall be insulated to Table 5-12 levels. <br /> O p Fmp eat puthermostat shall have progamable capability (S. 503.8.3.5) <br /> hermostat provided for each HVAC system with range of 55-75" F(healing)heating) (S.503.8.1O O .1). <br /> 0 0eadily accessible, automatic or Manual means provided to restrict or Heating input to each <br /> zone or floor during periods not requiring heat (S. 303.8.3.1). <br /> C3 p s ontrols for backup heat prohibit sirniltaneous operation of the primary system (S. 503.2.2(3)). <br /> ED 0 @DMechanical ventilatlol ^vstem shall have proper timers, and/or switches (VIAO. S. 302.3). <br /> 0 0 lechanical ventilation ducts sha!I have R-4 Insulation in umond.WMed spaces (VIAO,S. 302.5) <br /> O 0 s Mechanical ventilation supply ducts in cnnd lioned spaces shall have R-4 insulation(VIAO,302.5) <br /> @aDSUpply ducts shall have volume dampers, or the equivalent, to balance system(S. 503.6). <br /> O O o upply and return air ducts shall have sealed duct joints in unconditioned spaces (S. 503.10.2). <br /> 0 r VAC nlenums, supply, and return air ducts shall have R-8 insulation (Table 5-11, All options) <br /> Cl 0 z ,ectric water heater(s) shall have(S. 504.2.1,504.3, 504.4) a 1987 NAECA Lable on tank <br /> ❑separate power shut-off <br /> ❑noncompressible R10 pad (unheated spaces only) ❑ Temperature settings 120 F. <br /> 0 O @DShowers and lavatories shall limit flow to s 3.0 gallons/minute (S. 504.8.1). <br /> 0 O ee Swimming pools(S. 504.5) shall have: <br /> 0 readily accessible OIVOFF switch (pump, heater) ❑Pool cover ❑Piping Insulated to S. 503.11 <br /> 0 p Ss All fireplaces (VIAO, S.402.3) shall have: <br /> ❑ 6 square Inch combustion air supplyduct w/ accessible damper directly connect(d to the fire box <br /> C3 Tight fitting glass or metal oors. ❑ Tight fitting flue damper <br /> ❑ p e Solid fuel burning appliance s) (VIAO, S. 402.2) shall have: <br /> ❑Tight Iitiing glass or metal ouors <br /> 1 Outside combustion air source directly connected to the fire box <br /> ❑Exception: Non-direct,4"diameter, dampered, cumbuslion air source: allowed only for(1) new stove <br /> installations in existing homes where obstructionsprecludes direct combustion air, or (2) Central <br /> heating systems located in unhealed spaces. <br /> J p z Three month, etched track radon monitor,printed instructions, and information sheets shall be supplied <br /> to the single family dwelling or first floor units of multi-family dwellings by the general contractor(VIAO,S. <br /> 502.2.1), _ <br /> WSEC Final phase requirements: —� <br /> Inspectedby: - Date <br /> Page 6 0l 6 \\\ ---------— — <br />