My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> Err <br /> MEMORANDUM <br /> `✓41,o F'lrc�'LL- <br /> TO: -Kirk Brooks/AI Locke <br /> FROM: JaV. ` 259-8015 <br /> DATE: Avg �4- <br /> SUBJECT: Drainage Calculation Review, Dennis Petroleum <br /> Tn <br /> r "A The MDNS condition regarding infiltration of roof-top runoff must be addressed <br /> y (please see 7/14/95 calculation review memo). If suitable soil conditions do not exist <br /> on the site, that fact should be stated in the drainage calculations, or addressed in the <br /> cover letter. <br /> The MD § state 'thaAt <br /> nn lX <br /> co nee on p 'm ovi d f r to mu <br /> 12 .thc sto ateon atme cilities vided the De ium site ease4/95ation view m ). Th pass lin ust be <br /> constructed i theq ' uljlem t I cated on the aste ed of is <br /> ptoperty,.yr4e Cify -eic, S >'haf )f6e SygrYi and �in.�,rye <br /> 1/i7rr 6r e.rf4..�J•v AV 461' 2 r Sov/oy •-o�e.r Linr <br /> shot f'Ytiit- r/V,•ta lyo.,w7t A/U!/(d hvJ`�t�v�6e 4lef �dPMLt/q,f'/�w�»�: <br /> The storm drainage facilities on this site, <br /> must he designed for runoff from the Dennis Petroleum site and the access road only. ¢ <br /> The SBUIi calculations should = take into account for runoff from lot I, in either the Z4'orr <br /> pre-development or post-development calculations. Future development on lot I will 03k'vVA <br /> collect runoff at the northeast corner of that site, and will discharge to the bypass line BZ�-95 <br /> provided in the 25' utility casement on the Dennis Petroleum site. In addition, <br /> development on the Dennis Petroleum site will/should prevent runoff from sheet <br /> flowing onto the site from lot 1. -Provision must be made at the southeast comer-efthe <br /> Dennis Petroleum siloao-piek-up-surfac*-runoff from lot-I-and-lirectittc the-hypacs <br /> line- <br /> The pervious arca CNs and times of concentration should be different for pre- and <br /> post-development SBUIi calculations. <br /> Oil/water separator calculations are still needed per the 7/1 ' S calculation review <br /> memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.