My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 23, 1995 <br /> Mr. Norm Poser <br /> Larry Gottschalk Architect <br /> N 2312 Cherry Rd <br /> Spokane WA 99216 <br /> RE: Owner: Dennis Petroleum <br /> Job Address: xx 80th St SW <br /> Plan Check J1: B-48522 <br /> Dear Mr. Poser: <br /> In response to your application for a construction permit, your plans have been <br /> examined and you are advised that the issuance of a permit is being withheld for the <br /> reasons listed below. These comments address building issues only, additional <br /> revisions or additions may be required by other departments (such as Utilities, Planning <br /> or Fire). All references refer to the 1991 Uniform Building Code, as amended by the <br /> State of Washington and /or Washington State Energy Code 1994, 1st Edition, unless <br /> stated otherwise. <br /> 1. The plans submitted are incomplete. The comments that follow are general in <br /> nature and may not be complete. <br /> 2. Group B2 occupancies over 3,000 square feet shall be equipped with an <br /> automatic fire detection system (fire alarm system) per City Ordinance 1902-92. <br /> ā3. Openings in exterior walls within 20 feet of property lines shall be protected <br /> with 3/4-HR fire assemblies. Section 2003(b) This item applies to ths <br /> 0wall. <br /> .c⢠/7f/ <br /> ā4. Parapet wall height and construction shall be not less than indicated in Section <br /> 1710. ThqLeast hall requires parapet. <br /> - I714 <br /> 5. Provisions for roof drainage are required per Section 3207(b). Roof drains shall <br /> be sized per the Uniform Plumbing Code, Appendix D, using a rainfall rate of 3 <br /> inches per hour. <br /> 6. Roof drains shall be connected to the storm sewer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.