My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
1304 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
4/18/2017 9:52:55 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bob Landles - Planning Department <br /> jPublic Works Department L) � <br /> I <br /> December 18, 1979 <br /> S.E.P.A. Checklist Review #172 <br /> PROPOSAL: <br /> To construct approximately 15,000 square foot manufacturing and storage facility <br /> North of SR 526, South of 80th and bordering Broadway Auto Wrecking on the West. <br /> RECOMMENDATIONS: <br /> It is the recommendation of the Public Works Department that issuance of a Negative <br /> Declaration be ;ubject to the following: <br /> 1. A detailed drawing shall be submitted to the Public Works Department <br /> showing parking layout, landscaping, driveways, utilities, storm drainage, <br /> (including flow lines and grate elevations) and all required improvements <br /> to the public right-of-way. Public Works Department approval of these <br /> drawings is required before any permits arc issued. All improvements <br /> shall be completed before the Occupancy Permit is issued. <br /> 2. City streets are to be kept clear of dirt and debris during construction. <br /> 3. During construction, all truck traffic to and from the site within the <br /> City of Everett shall be on arterial streets unless otherwise approved <br /> by the Public Works Department. <br /> 4. Public Works Department approval of a temporary erosion control plan <br /> is required prior to commencing site preparation (for all the sites involved <br /> in grading & fill). <br /> 5. On-site detention with provision for oil and sediment removal is required. <br /> Drainage calculations are to be submitted with the attached cover sheet. <br /> 6. Participation in the program to fund the south end sanitary sewer interceptor <br /> is required. <br /> Amend Checklist As Follows: <br /> 11 - 13 - c, d, and f - change to yes. <br /> Information For the Developer: <br /> 1. A fire hydrant is required within 200 feet of all buildings. <br /> 2. Improvements to 80th Street shall be coordinated with Entranco Engineers <br /> for consistency with the 75th St. Local Improvement District. <br />
The URL can be used to link to this page
Your browser does not support the video tag.