Laserfiche WebLink
FINAL DECLARATION OF NON-SIG"'IFICANCE <br />SEPA It 35-83 <br />per the ordinance in effect at the time and according to the <br />information provided on the approved plans on the date of permit <br />issuance. <br />9. Land alteration activities must comply with Section 2 of the City <br />Design and Construction Standards: for erosion control measures, see <br />especially Sections 2.1.2. and 2.1.3. <br />10. A fire hydrent is required within 200 driving feet, but not closer than <br />50 feet, of every structure. <br />11. During construction, all truck traffic to and from the site within the <br />City of Everett shall be on arterial streets unless otherwise approved <br />by the Public Works Department. City streets and alleys are to be kept <br />clear of dirt and debris at all times during construction. Dust <br />suppression and street cleaning must occur as dirpeted by the Public <br />Works Inspector. <br />INFORMATION FOR DEVELOPER: <br />1. Performance guarantees are required for landscaping. <br />2. An one year guarantee is required on the site landscaping for an amount <br />not less than 10% of the cost of installation and shall run for one <br />year from the date of the first Occupancy Permit for the project. <br />PROPONENT: LOCATION: <br />Lord Electric Co. Inc. Northwest corner of Nardeson <br />2222 - 37th Road and 80th Street <br />Everett, WA. 98201. <br />Lead Agency: City of Everett Planning Department Receipt No. <br />Contact Person: Bob Landles Phone: 259-8731 File No. <br />This proposal has been determined not to have a significant adverse impact on the environment. <br />An Environmental Impact Statement is not required under RCW 43.21C.030(2)(c). This decision <br />was made after review by the lead agency of a completed environmental checklist and other <br />information on file with the lead agency. This Declaration of Non -Significance is specifically <br />conditioned on compliance with the conditions attached hereto which are incorporated by reference <br />as if fully set forth herein. <br />A fifteen day review period has elapsed for this project and no adv."TINGversecomments were <br />Responsible Official: <br />Title: <br />Dennis Derickson <br />Planning Director <br />L!'LARRV J _ D MS. MAIN —. <br />�-D000 II�1l, ❑ NOWIE <br />g"WALDO ---- rRED - - <br />Date: /� October 18, 1983 '. NORM <br />2 Gr �J�� r-URIAN <br />Signature: L/ <br />I <br />NOTE. This final Declaration of Non -Significance may, be with La vn-in. <br />changes in this proposal, or failure to comply with the conditions upon <br />of Non-Zignificance is predicated. <br />Q-tUNICE <br />_ SUE <br />this <br />