My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
615
>
615 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:22:54 PM
Creation date
4/19/2017 12:26:15 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />TO Bob Landles, Planning Department <br />FROM pub?ic Works Depart:ment�� � <br />DATE June 21, 1983 <br />SUBJECT SEPA Checklist Review g83/35 <br />CITY OF EVERETT. EVERETT WASHINGTON <br />PROPOSAL: <br />Grading/fill for office e,nd warehouse, NW corner, 80th and Hardeson. <br />RECOMMENDATIONS: <br />It is the recommendation cf the P,ib4c Works Department that issuance of a <br />Negative Declaraticn be subject to the following: <br />1. Detailed drawings, in accordance witli to the Public <br />Design and <br />Construction Standards, shall be submittedlandscaping, utilities, <br />Department showing site parking layout, <br />storm drainage, temporary construction erosion control, and all <br />required impro,4ements in the public right-of-way. Public Works <br />Department approval of these drawings is required prior to any <br />ements shall be <br />permits <br />ovedband warranted before threvoccupancy Permit is issued. <br />2. Participation in the cost to fund the south Everett lift station <br />required. The approximate cost based on the preliminary <br />warehouse <br />;pac i. The actualis git cost iOf shallcbeand <br />computedf it Of the <br />warehouse p <br />Building Department per the ordinance it. effect at the time an <br />according to the information provided on the approved plans on <br />the date of permit issuance. <br />3. In lieu of providing on -site detention, payment to City Drainage <br />Fund 340 is required. <br />ired in <br />ce with <br />4. SErosion ectionsc2.1 glanmeasures <br />2 i.3sofrltheeCityuDesign and Const u tion <br />Standards. <br />INFORMATION FOR DEVELOPER: <br />I. A fire hydrant is required within 200 driving feet, but not closer than 50 <br />feet, of every structure. <br />2. During construction, all truck traffic to and from the site within the <br />e <br />City of Everett shall be on arterial streets unless otherwise approvedbby <br />the Public Works Department. <br />3, City streets and alleys are to be kept ession and fdirt andc ee nri s at all <br />times during construction. Dust suF; <br />must <br />occur as directed by the Public Works Inspector <br />4. Performance guarantees are required for landscaping. <br />5. A one year guarantee is required on the site landscaping for an amount <br />and shall run <br />from the date of the ft Icss than lo% of ir t occupancyPermitt <br />cost of rmitfor the projectfor one year. <br />y., <br />LC/gs <br />
The URL can be used to link to this page
Your browser does not support the video tag.