My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
705 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
705
>
705 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:34:08 PM
Creation date
4/19/2017 12:27:14 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
705
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Because there is no addition to the total impervious area on the loading dock area there will <br />be no changes made to the existing runoff control system. <br />Runoff from the parking area will be directed into a wet pond that will be located at the <br />southeast corner of the project. This flow will be carried to the pond through a system of catch <br />basins and pipes. An oillwater separator will be placed in a catch basin that will treat the water <br />prior to entering the wet pond. The truck parking area will not flow through this catch basin but <br />rather through a coalescing plate separator system. A bypass structure will be installed which will <br />not allow flows greater than the 2 year flow rate to pass through the c.p.s. <br />A control structure will be placed in a catch basin that will restrict flow leaving the pond. <br />The control structure will have 2 orifices, the first will detain flow from the 2 year storm event and <br />the second will detain flow from the larger storm events. Runoff from these storm events will be <br />stored in the wet pond above the permanent pool elevation. <br />The modeling program used was Hydra, Version 5.12 by Pizer, Inc. A continuous model of <br />a Type ]A, 2411r. scorer was used. The computational method for the calculations is a modified <br />(urban) Soil Conservation Service (SCS). The storm events modeled were 6 month (24 hr.), 2 year <br />(24 hr.), 10 year (24 hr.), and 100 year (24 hr.). The storm Hyelographs are based on data found in <br />the Department of Ecology Stormwater Management Manual for the Puget Sound Basin. <br />The existing flows off the property are summarized in the following table: <br />0.08 c.f.s. <br />10 YR. EX 1 0.28 c.f.s. <br />100 YR. EX 0.63 c.f.s. <br />(All flow amounts taken from link 1, of the attached Existing Storm Analysis, pages 18, 20, and 22) <br />The allowable ofTsite flow for the two year storm event after re -development is half the <br />existing two year storm event flow, or 0.04 cfs. The pond will also be designed such that the 10 and <br />100 year stone events release at or below existing levels. <br />The wetpond will have a permanent pool volume equal to the volume of runoff from the 6 <br />month storm event using developed conditions. This storage would be 5,138 cubic feet (link 9 page <br />16) The welpond will consist of 2 cells the open water cell and the wetland treatment cell. The <br />open water cell will contain about 85% of the permanent pool volume at a depth of 4 feet. The <br />welland treatment cell will contain the remaining portion of the permanent pool at a depth of 2 feet. <br />An earthen baffle will be constnrcted to separate the two cells and it will have a top elevation equal <br />to the permanent pool elevation. The outflow of the pond will be controlled via a control structure <br />with circular orifices inside a catch basin. All calculations for sizing will Le the circular orifice <br />formula: <br />Q=CA 2gh <br />Where <br />Q=now, cfs <br />C = discharge coefficient, 0.62 <br />A = orifice cross -sectional area, sq. tl <br />g= gravitational acceleration, 32.2 it/sec <br />= <br />h = liquid head above center oforifice, ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.