Since the clearing and grading will occur on a relati ?ly large site and there are some areas that <br />contain steep slopes, certain measures should be take, to prevent erosion and sedimentation. <br />These measures might include but are not be limited to the following: <br />• From October I to April 30, no soils may remain exposed for more than 2 days. From May I <br />to September 30, no soil may remain exposed for more than 7 days. <br />• Materials, equipment, and other resources shall be on site at all times, in adequate quantities <br />to immediately stabilize all soil. <br />• Denuded areas shall be covered by mulch, sod, plastic, or other BMP's as per the City of <br />Everett's Stormwater Management manual. <br />• Soil stockpiles shall be stabilized or protected with sediment retention BMPs within 24 hours <br />of formation to prevent soil loss. <br />• Grading and construction shall be timed and conducted in stages to minimize soil exposure. <br />• The contractor shall establish a permanent vegetative ground cover to control soil erosion <br />and to survive severe weather conditions on all areas of land disturbance not otherwise <br />permanently stabilized by impervious surfaces or other means. <br />• The contractor shall maintain and repair as necessary all temporary and permanent erosion <br />and sedimentation control BMPs to assure their continued performance through construction <br />acceptance and .xtending to the release of all associated warranty security and maintenance <br />security. <br />• Befxe perfonning any grading or clearing, the contractor shall mark, in the field, the limits <br />of all proposed clearing and grading, critical areas and their buffers, trees to be retained, and <br />drainage courses. <br />• The contractor shall protect storm sewer inlets receiving storm water runoff during <br />construction so that water will not enter the inlet without first being filtered or otherwise <br />treated to minimize the amount of sediment entering the inlet. <br />• The contractor shall route storm water runoff from disturbed areas of the site through <br />sediment ponds, traps or other sediment retention BMPs prior to discharge from the site. The <br />BMPs shall be installed as the first step in grading, and shall be in operation before any other <br />site disturbance occurs <br />• The contractor shall preserve a vegetated butter strip around the lower perimeter of the site. <br />• The contractor shall design and construct temporary and permanent BMPs adequate to <br />prevent erosion of outlets, adjacent stream banks, slopes and downstream reaches. <br />• The contractor shall implement fully the erosion and sedimentation control plan at each stage <br />of site development. <br />