Laserfiche WebLink
,--Rpm. <br />ir, <br />C <br />9 H Vi <br />y 0 <br />K n <br />xj7� <br />�CA <br />H x <br />0H <br />�CM,g <br />n� n <br />�yt3�T. <br />8y <br />0tOv <br />la EA <br />HOvA <br />cr, <br />A11 774J67B <br />1� 1{/ RaIImod A,a <br />THE RICE GROUP, INC. P Ed1LW" IVOn <br />CONSULTING ENGINEERS " "M <br />JOB Pu�� W�L•'� ALE <br />SHEET NO <br />OF r <br />// L: 1lZILf <br />ff CATE <br />CALCULATED BY S.• <br />CHECKED BY <br />DATE <br />I Ip¢%a� <br />/-ODD /AMP41Ah�E <br />SMECT <br />Building Grass Net Required Proposed Required Proposed <br />n &H, Inge/'F Nt_Ign/OF Remarks <br />Total <br />74•I�•� Lois-'Ie.v <br />The required U-values are taken from Table 4-2 of the 1986 Washington State <br />Energy Code. Proposed U-values are calculated on the following pages. <br />Conclusion <br />The overall heat transfer of the building does not exceed the total that <br />results fron conformance to Table 4-2 of the energy code. Thus, the entire <br />building is in conformance with the code. <br />0 <br />