My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
421 85TH PL SW 2018-01-02 MF Import
>
Address Records
>
85TH PL SW
>
421
>
421 85TH PL SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 8:43:24 AM
Creation date
4/19/2017 1:23:54 AM
Metadata
Fields
Template:
Address Document
Street Name
85TH PL SW
Street Number
421
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[I <br />6. Noise <br />Thr prnject is exposed to relatively high noise peak; <br />the i:raffic on Casino Road and on Highway 526, <br />,rom <br />,aainly peak -hour r-mmuting traffic to and from the <br />Boeing plant and djace,t indus�:y. oise peaks adjacent <br />526 near the Hardeson Read undercrossing hay.2been <br />to <br />monitored at an L10 level at 75 to 79(L10) <br />4,40 vehficicles <br />1978 average daily traffic of 14,440 <br />combined leve Is <br />(10,200 on SR-526; 4240 on Casino Road). <br />for 1984 are predicted at double that figure (23,110 on <br />SR-526; 5680 on Casino Road). Audible traffic noise at <br />the site during the PM peak hour suggests that the noise <br />from Highway 526 is largely mitiga:ed, at this point, <br />by its relative elevation above the site, as well as <br />distance (600 feet from the north site boundary). tie <br />gation from distance alone would be at - <br />Although noise levels at the site are not presently avail- <br />the City of Everett will monitor existing peak hour <br />" <br />able, <br />levels along the north edge of the site. This will <br />noise <br />allow prediction, related to projected traffic levels, <br />of noise levels on the site. Noise mitigation through <br />3 <br />of a landscaped earth berm along the north <br />construction <br />oro ect sponsors. <br />boundary is being considered by j <br />site <br />be aided by site topography which could, with <br />This will <br />be <br />little modification, allow building1�-15sfaet. <br />Construct <br />below adjacent street elevation by <br />yj <br />tion of berms on the site perimeter can thus give line- <br />of -sight visual and noise screening for the majority of <br />s ,-• <br />units. <br />Additional noise mitigation will be provided by building <br />construction. Double -wall construction <br />orientation and <br />
The URL can be used to link to this page
Your browser does not support the video tag.