Laserfiche WebLink
Date Public Works Permit # <br />Application For .a Bldg. Dept. # 1 <br />PUBLIC WORKS PEe I T Public Works Fee $ 4S'4/ <br />r Total Fee <br />Cl 0 Less Appl. Fee Paid <br />CE <br />C`J — <br />Lf7 � *+3 �;r L+7 Balance Due <br />Print or Type Only r- cD r- na <br />y L <br />114 LUa `sS_A07 <br />Owner Mailing Address 6r ` • r..'s u can't r'-e «' Zip Phone <br />., wa C,a r•,t 91':*0irl" <br />C;a ca , 0- M C.,.i <br />P•? C3 t•—t F- ',, Cal :s-: UJ <br />'LtutiC <br />aw'A r"I <br />Applicant Mailing Address City Zip Phone <br />Describe Proposed Work &lzz' <br />W <br />Project Address (if known) z alz s <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS O <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. <br />Cl) <br />Q. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />6LPUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259-8810 <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the. <br />City and to re.Qlace public property damaged thereby. <br />d <br />g ture of A Drate. <br />ORK AUJKORIZED BY THIS P IT MUS BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />