My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 90TH ST SW 2018-01-02 MF Import
>
Address Records
>
90TH ST SW
>
1025
>
1025 90TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 3:23:49 PM
Creation date
4/19/2017 1:55:57 AM
Metadata
Fields
Template:
Address Document
Street Name
90TH ST SW
Street Number
1025
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION IMPORTANT: Disregard topics that don't describe your building or equipment. D.QNOI <br />APPPDVED place Decks In the two left columns. <br />ME <br />O <br />u <br />El <br />O <br />O <br />O <br />0 <br />O <br />O <br />O <br />9 <br />�l <br />HE <br />01 <br />r 3 Qo Aldlow from habitable rooms to whole -house fan ensured by undercut doors or grills (W.O, S. 302.6.4) <br />Loosellll Insulation OK if (S.502.1.4.5): <br />❑maximum celling slope s_3 In 12 <br />30" of clear distance from top of bottom chord to underside of roof sheathing at the roof ridge. <br />13 �mll black polyethylene ground cover, lapped 12" at joints and to foundation wall <br />0 learances shall meet listed minimums between Insulation and (S.502.1.4.3): <br />❑ chimney ❑ Non -IC rated recessed lights: 1/2" to combuslables, 3" to Insulation. <br />p yLQ:�:1rAttic hatch shall be insulated to required calling R-value and Is weatherstripped (S.502.1.4.4) <br />ElPAttic access shall have wood dam or equivalent to retain loose fill Insulation In attic (S. 502.1.4.4) <br />p II exterior doors (except 20 minute doors) shall be wealher6tripped (S. 502.4.3). <br />p r9hormostat <br />rvice hot 8, cold water piping shall be Insulated to R-3 (S. 503.11) <br />E3rvice recirculation hot water piping shall be insulated to Table 5-12 levels. <br />O provided for each FIVAC system with range of 55-75' F.(hoating) (S.503.8.1.1). <br />Oadily accessible, automatic or Manual means provided to Iesh" or shut-off Heating Input to each <br />11FIreplaco(s) <br />one or floor during poriods not requiring heal (S. 503.0.3.1). <br />Oontrols for backup heat prohibit simlllanoous operation of the primary system (S. 503.2.2(3)). <br />pechanical ventilation systems shall have proper timers, and/or switches (S. 302.3). <br />E3echanical ventilation ducts shall have Insulation a R-4 In unconditioned spaces (VIAO, S. 302.5) <br />0echanical supply ducts In conditioned spaces shall have a R-4 Insulation (VIAO, S. 302.5) <br />Oupply ducts shall have volume dampers, or the equivalent, to balance system (S. 503.6). <br />Oupply and return air ducts shall have sealed duct Joints in unconditioned spaces (S. 503.102). <br />aVAC plenums, supply, and return air duds shall have R-e Insulation (Table 5-11, All options) <br />Olectric water heater(s) shall have (S. 504.2.1, 504.3, 504.4) : <br />❑ separate power shut-off ❑ 1987 NAECA Lablo on tank <br />❑ noncompresslble R10 pad (unhealed spaces only) ❑ Temperature setting s 120 F. <br />phowers and lavatories shall limit flow to s 3.0 gallons/minute (S. 504.8.1). <br />pwlmming pool(s) (S. 504.5) shall have: <br />❑readily accessible ON/OFF switch (pump, healer) ❑ Pool cover ❑ Piping Insulated to S. 503.11 <br />p (VIAO, S. 402.3) shall have: <br />❑ 6 square Inch combustion air supplyduct w/ operable dampor, directly connected to the fire box <br />❑ T1ghl tilting glass or metal doors; or flue draft Induction fan. ❑ Tight filling flue damper. <br />O ? Solid fuel burning appllance(s) (VIAO, S. 402.2) shall have: <br />❑ Tight fitting glass or metal doors <br />❑ Outside combustion air source directly connected to the lire box <br />❑ Exception: Non -direct, 4" diameter, dampered, combustion air source: allowed only for (1) now stove <br />Installations In existing homes where obstructions preclude direct combustion air, or (2) Central <br />heating systems located In unhealed spaces. <br />0 Three month, etched track, radon monitor, printed Instructions, and an Information sheet shall be <br />supplied by the builder to each single family dwelling and to each ground floor unit of multi-lamily dwellings <br />(VIAO, S. 502 2.1). <br />WSEC Final phase requirements: <br />Inspected by: <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.