Laserfiche WebLink
1 <br />Ile i-� <br />Aft - <br />TO: CITY OF EVERETT PUBLIC WORKS\ <br />ATTN: MR. STEVE MILLER <br />3200 CEDAR ST. <br />EVERETT, WA. 98201 <br />FROM: IMPRFSSION DESIGN <br />2418 CALIFORNIA SUITE "C <br />EVERETT, WASHINGTON 98201 <br />(425)252-9200 <br />3ULY 24,2000 <br />1-(2T .2 V 9/9y <br />RE: MCCAULEY APARTMENT, 1025.90nt ST. S.W. <br /># B0006.018 & 019 <br />Dear Steve, <br />This is a response to your letter dated 7-19-00 <br />//Item # 1 see note I added to sheet A I <br />V Item#2 see note 2 added to sheet Al <br />t"Item43 see stamp added to submittal <br />/ltem#4 see added note to far right garage on sheets A2 and A6 <br />see added detail 2 on sheet A9 <br />"Item45 see added notes to sheets A2 and A6 <br />%��% %(V� \� <br />V <br />96 tiOo� <br />�2 'X <br />0F �e�Pce• <br />Item#6 2 story construction <br />Maximum floor area of any given story proposed is less than 6,000 sq. It <br />Type V-N construction is allowed <br />Ono hour walls and ceilings are required where walls end ceilings separate a dwelling from <br />)t7 another dwelling or a garage from a dwelling or a garage from another garage <br />The revised plans reflect this <br />�1tem#7 per the plans the joists and trusses nm parallel to the shear wall. <br />V Floorjoists have been added to said wall section. <br />Note that the title of said wall section is changed, you are correct; only a one -hour wall is needed. <br />However the structural engineer requires 2 layers of gypsum wall board running continuous to <br />underside of roof deck, -thus providing also an effectual draft stop in the attic in line with the <br />wall separating dwellings. <br />