Laserfiche WebLink
7. Section I on sheet A9 should be revised to show the correct joist and truss <br />configurations. Draft stops are required per sec. 708.3.2.2. The need for a 2-hour <br />wall appears unnecessary. <br />8. The plans should indicate the requirement for safety glass at the hazardous locations <br />of sec. 2406.4. <br />9. The elevations and floor plan of the porch at the left front of the 4-plex should be <br />revised to agree with each other. <br />Please prepare a response letter showing where each item in this correction letter is <br />addressed on the plan set. <br />Upon submittal of the drawings, your application will be given priority and plan review <br />will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, JAI <br />� I' <br />Steve Millet <br />Associate Engineer. PE <br />B0DD4-018 & 019 <br />(D <br />