Laserfiche WebLink
INSPECTON IMPORTANT: Supply Information In the shaded area by checking the appropriate circles. <br />APPROVED Disregard topics that don't describe your building or equipment. DO NOT place checks In <br />the two left columns. <br />FOUNDATION PHASE, <br />] <br />❑ <br />0 Slab Insulation (Table 6.1) shall be R-10 and located on the: <br />0 A. Exterior (See INSULATION INSPECTION). <br />OR <br />0 B. Interior extending downward from the top slab surface to Its undersudace and <br />horizontally under the slab for a total distance of 24', or vertically 24". <br />❑ <br />Radiant Slab Insulation shall have R-10 and extend under the entire siab(S. 502.1.<,9) <br />❑ <br />8 Below grade masonry wall insulation (S. 502.1.4.10) shall be lull -depth and located on the: <br />0 A. Exterior and rated R-10 (See INSULATION PHASE). <br />OR <br />0 B, Interior (See INSULATION PHASE <br />❑ <br />D Thermal break(s) shall be placed In the slab (S. 502.1.4.8. 201.1: BUILDING ENVELOPE) <br />between the conditioned and unconditioned spaces checked below, and extend from the lop of the <br />slab to the bottom, then underneath toward the conditioned space for a 24' total developed dimension. <br />0 dwelling/garage O dwollingR:onnected space 0 ;lab edge and foundation wall. <br />❑ <br />QRadon mitigation system (VIAO, S. 502.1) shall be installed it one of the following is checked: <br />0 A. Net foundation ventilation area is less than 1 FT2 per 300 Ft2 of crawl space <br />O B. Foundation vants are closable. <br />(� C. Under floor plenum acts as supply or return air duct <br />WSEC Foundation phase requirements: <br />Inspected by: —Date. J <br />❑ <br />❑ <br />O All structural panels such as plywood, particle board, wafer board, and oriented strand boa:d shall be <br />tabled " EXPOSURE I" "EXTERIOR" or "HUD -APPROVED" (VIAO, S. 401.1). <br />❑ <br />❑ <br />O Insulation baffles shall be placed in attics/ceilings to maintain at least 1" ventilation space and extend at <br />least 6" vertically above baits or 12" vertically above loosefill insulation (S. 502.1.4.5). <br />❑ <br />❑ <br />QGlazing elflciency requir d under the selected option shall be (S. 502.1.5, 602.7 �, Table 5-1): <br />s U.46 (Option I) s U.43 (Options 11) O s U.40 (Option III, IV) <br />O s U.39 (Option V) O s U.36(Oplion VI) s U.35 (option VII) 0 s U.32 (Option VIII) <br />Symbols used: r equals a greeter than < less than greater than or equal s less than or equal <br />UPDATED SEPTEMBER 1991 <br />Page 2 of 6 <br />