Laserfiche WebLink
SCHEDULE: <br />To be determined by mutual agreement. <br />DELIVERABLES <br />M <br />1. Complete Library listing identifying the number of drawings/sheets required for each of thefollowing <br />Water Filter Plant functional areas: <br />Air Scour Blower <br />Filter Consoles <br />Generators <br />Plant One Line <br />FW Pump Station #1 <br />Hypochlorite Building <br />Reclaimed Water Pump Station <br />Soda Ash Panel <br />Plant Water Building <br />Chemical Feed System <br />Fluoridation System <br />Main Control Panel <br />PLC Network Diagram <br />FW Pump Station #2 <br />Backwash Pump Station <br />Portal #6 <br />Floc Building <br />Misc <br />2. All 25 Bacicwash Pump Station drawings to a minimum of 50% completion. <br />3. All 25 Backwash Pump Station drawings to a minimum of 75% completion. <br />4. All 25 Backwash Pump Station drawings to a minimum of 90% completion. <br />5. All 25 Backwash Pump Station drawings accepted by City staff as 100% complete. <br />Page 12 <br />(Form Approved by City Attorney's Office November 1, 2009) <br />261 <br />