My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/05/26 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/05/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:55:47 PM
Creation date
4/19/2017 11:06:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in <br />services and/or equipment or supplies provided which are accepted by the Department, (iii) other work,' <br />services and/or equipment or supplies which are accepted by the Department, and (iv) the protection <br />and preservation of property. <br />Failure to agree with such amounts shall be a dispute within the meaning of the "Disputes" clause of <br />this contract. If the termination is for cause, the Department shall determine the extent of the liability of <br />the Department. The Department shall have no other obligation to the Contractor for termination. The <br />Department may withhold from any amounts due the Contractor such sum as the Department <br />determines to be necessary to protect the Department against potential loss or liability. <br />The rights and remedies of the Department provided in this contract shall not be exclusive and are in <br />addition to any other rights and remedies provided by law. <br />After receipt of a notice of termination, and except as otherwise directed by the Department in writing, <br />the Contractor shall: <br />a. Stop work under the contract on the date, and to the extent specified, in the notice; <br />b. Place no further orders or subcontracts for materials, services, supplies, equipment and/or <br />facilities in relation to this contract except as may be necessary for completion of such portion of <br />the work under the contract as is not terminated; <br />G. Assign to the Department, in the manner, at the times, and to the extent directed by the <br />Department, all of the rights, title, and interest of the Contractor under the orders and <br />subcontracts so terminated, in which case the Department has the right, at its discretion, to <br />settle or pay any or all claims arising out of the termination of such orders and subcontracts; <br />d. Settle all outstanding liabilities and all claims arising out of such termination of orders and <br />subcontracts, with the approval or ratification of the Department to the extent the Department <br />may require, which approval or ratification shall be final for all the purposes of this clause; <br />e. Transfer title to the Department and deliver in the manner, at the times, and to the extent <br />directed by the Department any property which, if the contract had been completed, would have <br />been required to be furnished to the Department; <br />f. Complete performance of such part of the work as shall not have been terminated by the <br />Department in compliance with all contractual requirements; and <br />g. Take such action as may be necessary, or as the Department may require, for the protection <br />and preservation of the property related to this contract which is in the possession of the <br />Contractor and in which the Department has or may acquire an interest. <br />AAG Approved 9/12/2007 <br />DHS-FEMA-EMPG-FFY 10 Page 13 of 21 City of Everett Emergency Management <br />78 E10-249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.