Laserfiche WebLink
INFORMATION POR DEVELOPER <br /> 1. Detailed drawings in accordance with city design and construction <br /> standards shall be submittea to the Public Works Department showing <br /> utilities, storm drainage, temporary construction erosiou control. <br /> Public Works Department approval of these drawings is required prior to <br /> any permits being issued. All improvements shall be completed and <br /> approved before the Final Approval is issued. <br /> � . City streets are to be kept clear of dirt and debris at all times <br /> during construction. Dust suppression and street cleaning must occur <br /> as directed by the Public Works Inspector. <br /> 3. A two year guarantee is required for private retention/detention or <br /> other drainage treatment/abatement facilities serving areas larger than <br /> one acre. <br /> 4. A permit is required for the destina;•lon of any fill placed off the <br /> site. <br /> 5. An additional SEPA review will be required for any future buildings <br /> constructed on the site. The future parking shown on the site plan is <br /> covered in the current reivew. <br /> 1135E <br />