My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3642
>
Resolutions
>
Resolution 3642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 11:24:00 AM
Creation date
4/20/2017 11:23:47 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3642
Date
7/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1993 TO 1998 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN (TIP) <br /> Principal Arterials Traffic Signals <br /> 1. Alverson Bridge 1 . Everett Avenue Signals <br /> 2 . SR 526/I-5 Interchange 2 . Signal Master & Interconnects <br /> 3 . Paine Field Blvd./SR 525 3 . Interim Traffic Signals <br /> 4 . 19th Avenue SE 4 . Signal Interconnect (SR 99) <br /> 5. Evergreen Way (75th - SR 526) 5. HES Signal <br /> 6 . Evergreen Way (75th - Madison) 6 . Developer Signals <br /> 7 . Evergreen Way (Madison - 52nd) 7. HES Projects <br /> 8. E. Marine View Dr. <br /> 9. W. Marine View Dr. <br /> 10. SR 526/Evergreen/Casino Transit Improvements <br /> 11 . SR 525 HOV Lanes <br /> 12 . SR 526 HOV Treatment 1 . Transit Operating Assistance <br /> 13 . Paine Field Blvd. Ext. Study 2 . Fleet Expansion (40' Buses) <br /> 3 . Fleet Expansion (30' Buses) <br /> 4 . Fleet Replacement (40' Buses) <br /> Minor Arterials 5. Fleet Replacement (Vans) <br /> 6. Fleet Replacement (Supp. Veh. ) <br /> 1. 112th Street 7 . Office Equipment <br /> 2 . 41st Street 8 . Computer Equipment <br /> 3 . 4th Avenue West 9 . Maintenance Tools & Equipment <br /> 4 . Madison Street 10 . Operational Analysis Report <br /> 5. Seaway Boulevard 11 . Transit Center Land Acquisition <br /> 12 . Transit Center Design & Constr. <br /> 13 . Park & Ride Land Acquisition <br /> Collector Arterials 14 . Park & Ride Design & Constr. <br /> 1 . 75th Street <br /> 2 . 7th Avenue SE Study <br /> Vicinity Improvements <br /> 1. Annual Street Overlays <br /> 2 . Pedestrian Improvements <br /> 3 . Neighborhood Block Grant <br /> 4 . Pavement Markings <br /> 5. Neighborhood Mitigation Projects <br /> 6 . Regional Trail System <br /> 7 . Community Trail System <br /> 8 . Neighborhood Trail System <br /> 9 . Neighborhood Traffic Studies <br /> 10 . Roadway Hazard Elimination <br />
The URL can be used to link to this page
Your browser does not support the video tag.