Laserfiche WebLink
• s INSTRUCTIONS FOR PREPARING SIX-YEAR <br /> TRANSPORTATION IMPROVEMENT PROGRAM <br /> NOTE: This form is set up in Tice'typewriter format(10 characters per inch)for coding computer input.Computer space for the description of work is limited so <br /> brevity is encouraged. <br /> • <br /> A. A planning obligation program indicating the allocation of funds to major phases of project development,i.e.preliminary engineering,right-of-way and <br /> construction.Show the funding amount for the entire phase or phases in the expected year of expenditure even though the expenditure of funds may take <br /> place over several years. <br /> B. Include all proposed projects regardless of location or source of funds,however,urban and rural arterial trust fund projects need to be included only in six- <br /> year transportation Improvement programs beginning In odd numbered years. <br /> C. Show the amount of Federal funds to be obligated in the appropriate column of the Federal Obligation Plan. <br /> D. Complete the form for the six-year program In accordance with the following instructions: <br /> HEADING <br /> City/County: Enter name of local agency and appropriate county. <br /> County Number Enter the O.F.M.assigned number in code blocks. <br /> City Number Enter the O.F.M.assigned number in code blocks. <br /> Hearing Date' Enter the date of action by the City Council or County Legislative Authority. <br /> Adoption' Enter the date of action by the City Council or County Legislative Authority. <br /> Resolution Number Enter City Council or Co.Legislative Auth.resolution number(if applicable). <br /> COLUMN NO. <br /> • <br /> 1 Functional Classification Enter the appropriate two digit code denoting the Federal Functional Classifications (Note:The <br /> Federal Functional Classifications shown on the official functional classification maps prepared by <br /> WSDOT.) <br /> Rural(under 5,000) Urban(Over 5,000) <br /> Code Code <br /> Block Block <br /> 1 2 Description 1 2 Description <br /> O 1 °rincipal Arterial—Interstate 1 1 Principal Arterial—Interstate Other Freeways <br /> O 2 Principal Arterial—Other(State) 1 2 Principal Arterial--or Expressways <br /> 0 6 Minor Arterial 1 4 Principal Arterial-Other(FAM) <br /> 0 7 Major Collector(FAS) 1 6 Minor Arterial—(FAM) <br /> 0 8 Minor Collector 1 7 Collector—(FAM) <br /> O 9 Local(Access) 1 9 Local—(Access) <br /> (Note:If Rural or Urban Arterial Trust Funds(Col.15)are to be used as funding source,the appropriate code number must be shown.) <br /> 2 Priority No. Enter local agency project Identifying numbers in priority order. <br /> 3 Proiect Identification Enter appropriate information noted. <br /> 4 Maior Class of Work Enter the appropriate code number(s). <br /> 1. New construction on new alignment 6. Traffic control 10. Transit Capital Project <br /> 2. Major widening(additional lanes) 7. Capital purchases 11. Transit Operating Project <br /> 3. Minor widening(Increase lane width,add shoulders) 8. Non capital improvements 12. Transit Planning Project <br /> 4. Rehabilitation/reconstruction 9. Non motor vehicle use <br /> 5. Resurfacing <br /> 5 Work Codes Enter the appropriate code letter(s). <br /> A. Grading L. Bridge <br /> B. Draining M. Landscaping <br /> C. Light Bituminous Surface N. Paths&Trails <br /> D. A.C.or P.C.C.Pavement O. Bikeways <br /> E. Sealcoat P. Transit Facility <br /> F. Curbs&Gutters O. CarNan Pool Program <br /> G. Sidewalks R. High Occupancy Vehicle Lanes <br /> H. Channelization S. Surveillance Control&Driver Information <br /> I. Signalization T. Ferry Facility <br /> J. Lighting U. Project Studies <br /> K. Signing <br /> • <br /> 6 Total Length In Milos Enter length of project to nearest hundredth. <br /> 7 Carryover Projent Enter(x)if project is carried over from previous year.(Funds were planned for expenditure but were <br /> not expended during previous year.) <br /> 8 Funding Stnhus Use the funding code that best describes the likelihood of this project being constructed. <br /> F. Funded <br /> P. Proposed for Funding <br /> U. Funding is Unknown <br /> 9 thru 12 f1st.2nd.3rd.4 5&6th vearsl Enter the estimated project costs(in thousands of dollars)planned for expenditure in each <br /> year. <br /> 13 Total Funds Enter total project cost.(This should equal Col.9-12.It should also equal Col.14-16.) <br /> 14 thru 16 Funding by Source Enter the dollar amount(In thousands of dollars)planned to be programmed under the applicable <br /> funding source column In appropriate coding blocks.For CAPP,RAP,etc.use the code followed by <br /> P. CAPP T. TA' the amount.(The Federal programs require completion of Federal Obligation Plan,Columns 18 thru <br /> R. RAP U. UATA 20.) <br /> 17 Utility Codes Enter the appropriate code letter(s)for the utilities that would need to be relocated or are Impacted by <br /> proposed construction of the project. <br /> C. Cable(TV) <br /> G. Gas <br /> P. Power <br /> T. Telephone <br /> S. Sewers(Other than Agency Owned) <br /> W. Water <br /> O. Other <br /> 18 Federal Project No A.(4) Program=BROS,BRM,BRS,RS,M.HES,RRP,RRS,etc. <br /> (xxxx-xxxx-xxx) B.(4) Route-Federal Route Number. <br /> ( A-B-C ) C.(3) Sequence-Assigned at fund approval stage by Local Programs <br /> 19&20 Federal Funding Obligation P.E. = Enter the amount(in thousands of dollars)of the proposed Federal 6md4 <br /> to be obligated In the appropriate column.(This item should not include <br /> any phases for which Federal funds have already been authorized.) <br /> Federal Funding Obligation RNV = (Same as P.E.) <br /> Federal Funding Obligation Const = (Same as P.E.) <br /> DOT 140-049(BACK) <br /> Revised 3/92 Frame <br />