My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3642
>
Resolutions
>
Resolution 3642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 11:24:00 AM
Creation date
4/20/2017 11:23:47 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3642
Date
7/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 1-/-Y Z Pg 1 <br /> Adoption Date ^/-/-fz <br /> City No.: 0420 <br /> County No.: 31 PRINCIPAL ARTERIALS IN THOUSANDS$ <br /> � Resolution No.� .,. <br /> F P PROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> • <br /> U r a 0 A U <br /> N i DESCRIPTION OF WORK jo work T L R N OBLIGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN <br /> C o f code A E R D SCHEDULE PLAN <br /> TC r (Street name or number, C (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NL i Co.road name or number, Iw G 0 S Local RAP, UTILITY AIDFIRST 2ND <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT: YEAR THRU <br /> S y Describe work to be done) sr H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/AmtELEMT. YEARS <br /> 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 18 19 20 <br /> 14 1 ALVERSON BRIDGE 4 ABDG 0.2 • F 5000 1400 8400 4500 1900 CPT 2799 P.E. <br /> CONSTRUCT REPLACEMENT BRIDGE HJKL .R/W <br /> CONST <br /> FUNDED BY WASHINGTON STATE LEGISLATURE&PORT OF EVERETT TOTAL , <br /> 14 2 SR 528/INTERSTATE 5 INTERCHANGE 2 ABDH F 800 1 4400 1 2800 1 2000 1 8000 1 8000 1 1 1CPT 1 526 P.E. <br /> NEW RAMP EASTBOUND SR 526 TO NORTHBOUND INTERSTATE IJKL R/W <br /> 5;ENVIRONMENTAL REVIEW,DESIGN&CONSTRUCTION CONST <br /> TOTAL <br /> 14 3 PAINE FIELD BLVD./SR 525 1 ABDF 5 • F/ 18125 1 26825 1 24650 1 2900 1 72500 1 10000 1 4900 1 57600 1SCOPT I 2781 P.E. 400 <br /> SR 526-SR 99;SR 525/SR 99 INTERCHANGES; GHIJKLR PR/W <br /> ENVIRONMENTAL REVIEW,DESIGN&CONSTRUCTION ,CONST 4500 <br /> ROADWAY IMPROVEMENTS TIE PROJECT;CITY OF EVERETT LEAD W/SNOHOMISH COUNTY&WSDOT;ISTEA PROPOSED FOR PFB TOTAL 400 4500 <br /> 14 4 19TH AVENUE SE(SR 527) 2 ABDF 0.8 • F 250 1 750 1 3500 1 3500 I 8000 1 4000 1 4000 1 'CPT 1 2723 P.E. <br /> 112TH-132ND STREET GHJK R/W <br /> ENVIRONMENTAL REVIEW,DESIGN&CONSTRUCTCONST <br /> STREET WIDENING TIB PROJECT;SNOHOMISH COUNTY LEAD W/EVERETT&WSDOT TOTAL <br /> 14 5 EVERGREEN WAY 2 ABDF 0.5 * P 1 128 1 512 1 1 640 1 128 1 1 512 1CPT 1 2791 'P.E. <br /> 75TH-SR 528 GHIJK ,R/W <br /> DESIGN&CONSTRUCT STREET WIDENING;7 LANES •CONST <br /> PROPOSED UATA PROJECT TOTAL <br /> 14 8 EVERGREEN WAY 2 ABDF 0.4 • P 1 235 1 937 1 1 1172 1 234 1 1 938 1CPT 1 2791 P.E. <br /> M?DISON TO 75TH STREET GHIJK -A/W <br /> DESIGN&CONSTRUCT STREET WIDENING;7 LANES )CONST <br /> PROPOSED UATA PROJECT _TOTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.