My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3642
>
Resolutions
>
Resolution 3642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 11:24:00 AM
Creation date
4/20/2017 11:23:47 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3642
Date
7/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 7-/-`/i Pg 2 <br /> CIty No.: 0420 Adoption Date 7-/-94 <br /> CountyNo.: 31PRINCIPAL ARTERIALS Resolution No. 4(.4 <br /> F P PROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS IIN THOUSANDS$ <br /> U r a 0 A U <br /> N I DESCRIPTION OF WORK jo work T L R N OBLIGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN <br /> C o f code A E R D SCHEDULE PLAN <br /> TC r (Street name or number, c (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NI. i Co.road name or number, Iw G 0 S Looal RAP, UTIUTY AID FIRST 2ND <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT YEAR THRU i <br /> S y Describe work to be done.) sr H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/Amt ELEMT. YEARS <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 _ 14 15 16 17 18 19 20 <br /> 14 7 EVERGREEN WAY 2 ABDF 1 * P 550 2190 2740 548 2192 CPT 2791 P.E. <br /> 52ND STREET TO MADISON GHIJK RNV <br /> DESIGN&CONSTRUCT STREET WIDENING;7 LANES CONST <br /> PROPOSED UATA PROJECT 'TOTAL <br /> 14 8 E.MARINE VIEW DRIVE 4 ABDF 0.9 * U 100[ 400 1 1000 1 3600 1 5100 1 I 51001 1CPT 1 2799 P.E. 785 <br /> ALVERSON BRIDGE TO SR 529 GHJK R/W 1020 <br /> DESIGN&CONSTRUCT STREET WIDENING; CONST 3315 <br /> WIDEN E.MARINE VIEW DR./SR 529 OVERCROSSING ANTICIPATING MTMC FUNDS ,TOTAL 5100 ; <br /> 14 9 W.MARINE VIEW DRIVE 2 ABDF 0.8 * P 1000 1 10001 1 1 2000 1 2000 1 1 'CPT 1 2799 P.E. <br /> 18TH-10T1-1 GHJK R/W <br /> ROADWAY IMPROVEMENTS CONST • <br /> JOINT CITY/PORT PROJECT TOTAL <br /> 14 10 SR 526/EVERGREEN&CASINO 2 ACHI * P 50 1 200 1 750 1 1000 1 2000 1 2000 1 1 1CPT 1 526 P.E. <br /> EVERGREEN&CASINO R/W <br /> INTERCHANGE&INTERSECTION IMPROVEMENTS (CONST <br /> TOTAL <br /> 14 11 SR 525 HOV LANES 2 ABDH 2.6 P 490 1 2280 1 13500 1 1 16270 1 13770 1 1 2500'CPT 1 525 P.E. <br /> SR 99 TO INTERSTATE 5;ENVIRONMENTAL REVIEW,DESIGN R/W <br /> &CONSTRUCT ROADWAY IMPROVEMENTS CONST <br /> TIB PROJECT;CITY OF EVERETT LEAD W/WSDOT(CAT.C) TOTAL <br /> 14 12 SR 526 HOV TREATMENT 2 ABDH 4 P 1 2000 1 2000 1 2000 1 6000 T 6000 1 1 1CPT 1 526 P.E. <br /> INTERSTATE 5 TO PAINE FIELD BLVD.;ENVIRONMENTAL IJKR R/W , <br /> REVIEW,DESIGN 8 CONSTRUCTION ,CONST <br /> TOTAL <br /> 14 13 PAINE FIELD BLVD.EXTENSION STUDY 8 U * F 250 1 F I I 250 1 250 1 1 1 1 525 P.E. <br /> SR 526 TO MUKILTEO BLVD. RIW <br /> ENVIRONMENTAL REVIEW CONST I <br /> FUNDED BY WSDOT,MUKILTEO,EVERETT&BOEING TOTAL <br /> 14 14 1-5 AND 12TH STREET N.E. 1 U U 1 loot- 1 I 100 I 100 I I I I P.E. <br /> INTERCHANGE FEASIBILITY STUDY R/W <br /> CONST <br /> TOTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.